As I have an EV, with 7KW charger, and cheap overnight tariff, and also have a large set of batteries which, when PV is low, I charge them overnight at around 6KW.

Along with the heatpumps, timed-dishwasher, washing machine and tumble dryer, I often use over 90A on my 100A supply.

It got me wondering, does the fuse pop at 100A or is there a region? Am I 1 late night cup of tea from calling the DNO for another fuse??

For interest, I walked around with a thermal camera and can see things warming up nicely but nothing super hot. CU is around 30C, all breakers inside are ok, one of the cables feeding the PV equipment peaks at 50C for a bit (soon to upgrade to 6mm as I need another 2KW down that for another charger)


r/ukelectricians • • 2h ago

Grouping circuits within SWA

2 Upvotes

Hi all,
Per the title, has anyone any experience with this?

I’m putting a new heater circuit and a shed feed in for a customer. The heaters are to be on an outside wall, and they’ve asked to feed from the back to avoid damage or trunking inside. The shed feed will take the exact same route, so I’m thinking of taking a 5core from the board to a wiska box behind where heater 1 will be, continue to another wiska behind heater 2, then drop to a 3 core to carry onto the shed.
I can’t find anything in the book stating that I can’t do this, so if each core is marked up correctly I can’t see a reason why not.
Where I’m then struggling is grouping factors, do I take table 4C1 and treat is as ‘2, single layer on wall’ as it’s a single multi core cable or ‘1, bunched in air, on a surface, embedded or enclosed’ (as if the SWA is acting as conduit)
The heaters they have are 2kw and 2.3kw respectively so I can put them on 25a, they want 32a feed to the shed.
I can make it work with 4mm SWA on 0.85 but not 0.8, can I do that or do I just tell them the shed is going on 25a? There’s no reason it needs 32a from what they’ve told me. 2 lights and 2 sockets to charge power tools and run a lawnmower.
Yes, I know I could go up to 6mm but it makes no sense fighting a 6mm into spurs if I can avoid it.

Thanks in advance.


r/ukelectricians • • 3h ago

Adding a standalone battery alongside an existing solar/battery system

0 Upvotes

Hi,

I've got an existing solar + battery system that was installed years ago (indoors), and the storage capacity is on the low side. Installers I've spoken to don't want to extend it because of the newer regs.

So I'm looking at a separate battery-only system installed alongside the existing one rather than adding to it.

Will the two systems with their own CT clamps fight?
Will one battery discharge into the other?
Will have have to replace whats currently there?

Thanking you kindly


r/ukelectricians • • 4h ago

Can I install Hive Receiver myself?

Thumbnail
gallery
2 Upvotes

Hi all,

Looking for some much needed advice.

Got a Baxi 800 combi boiler, and want to fit a hive thermostat.

The boiler has a thick single cable coming out of bottom to the existing receiver box on the wall.

Can I just remove that box and replace with the Hive one?

Picture shows exiting box on wall and instructions for both baxi and hive boxes.

Thanks all in advance.


r/ukelectricians • • 6h ago

Question regarding cable rating of cable inside conduit in a heavily insulated wall

Post image
6 Upvotes

I dont know if Im overthinking this massively so Im after some advice.

Ive completely rewired a house but the sound coming from the other semi is ridiculous and Im going to install 2 sound proof studded walls either side of the chimney stack to block the noise from next door.

I have a socket in each alcove that is currently sat in 25mm conduit and a pattress box while the stud wall is built (the cables to the left are network and speaker cables).

The stud wall will sit approx 100mm off the current wall once the double plasterboard and insulation is fitted.

Circuit is a Ring main, approx 50 meters full length, 5 sockets, rest of the ring main is clipped to joists fed from a 32a type b RCBO.

Im assuming, if Ive calculated everything out ok, that by screwing the conduit to the inner side of the stud wall the cable run will be classed as class A giving the cable rating of 20A which is the minimum pass for a ring main, the only way I can increase it is by clipping it to the plasterboard which would require cutting notches on the front side of the stud wall which would rate it as 21A. I just need to make sure the conduit is not completely covered by the sound proof insulation.

Does anyone have any experience with runnig cables in sound proof walls and can advise? am I overthinking or is everything within rating.


r/ukelectricians • • 13h ago

Full rewire for Wheelchair user

2 Upvotes

Can electricians please advise what considerations should be taken when having a full rewire for someone who has arthritis and is wheelchair and bed bound?


r/ukelectricians • • 17h ago

I'm a solar / electrical designer, what do I do for qualifications?

4 Upvotes

Hi Reddit

I did engineering at Uni, got a grad scheme job and learnt commercial solar PV design, and BS7671 electrical design. It's quite easy to get the hang of the solar really, and quite rewarding.

Most SLDs we put out, are simply a case of choosing the right cable / breaker for new circuits, based on installation method, and making sure existing equipment was rated high enough. We used a program called ElectricalOM, running off BS7671 reference tables.

But I moved out of my university's city, back to live with my parents (rent cost on £29K not very sustainable long term!)

I have joined another electrical design company local to me (I'm the only engineer in the UK lol, on £30k, rest are based offshore in India). These SLDs are drawn in CAD, and cables sized using an excel macro lol using the BS7671 tables. We also do MV and HV design (33kV - 132kV substation design)

The issue, i'm looking for other jobs, but feel like I have zero qualifications other than my degree.

What qualifications would you recommend? Should I do my 18th edition? Or is that a bit worthless without the L2 L3 actual electrician qualifications.

Feel like i've been working in a field for 2.5 years now on something I have no qualifications for!

Thanks


r/ukelectricians • • 17h ago

Nvq 2357

1 Upvotes

I’ve just got my nvq and am2 to pass how long will this take roughly to gain evidence I’m working everyday in the electrical field


r/ukelectricians • • 20h ago

What’s the damage?

Thumbnail
gallery
3 Upvotes

Just got the keys to our first home, a 1958 3 bed semi-detached property. RICS survey came back and said that electrics seemed okay but to get an electrician to do a proper check. Downstairs had a rewire in 2008 at the same time as the kitchen was fitted, so no EICR but and installation certificate for the rewire.

Electrician came yesterday and told us that the rewire downstairs was a sloppy job. There are no earths behind the light fittings downstairs, low insulation in some of the plugs etc. Recommended a full rewire (except the kitchen) and quoted a ballpark £7000.

We knew going into it that we would probably need to rewire upstairs but hoped that downstairs would be okay as it had only been done in 2008, not realising how botched the job was. We are currently asking around for quotes but obviously £7000 is a lot of money to spend. We do see this as our forever home!

I’ve attached all the images he’s sent. As an FTB I’m obviously not too sure what it is that I’m looking at. What would you recommend we do next?

TL:DR - what do the pictures mean and how much would it cost to rewire the whole house except the kitchen?


r/ukelectricians • • 22h ago

Insulated Spanners/Ratchets

1 Upvotes

Alright lads and ladies,

I'm looking for a good brand of insulated spanners and Ratchets. Got myself a new job as an engineer at a local port and I'm working on some of the older cranes and well let's say some of the work done before has been a bit ropey.

DC is scary when your working on big shizz like that so I'm looking decent tools for working on the battery's and other bits.

Cheers in advance!


r/ukelectricians • • 23h ago

Single core cable without a CPC

Post image
6 Upvotes

I must admit I've never come across this before, so just curious if this used to a be common practice?

Instead of running a 3 core cable seems a twin and earth was run with an extra cable alongside it to use as a second strapper at the other two way switch.

What I find strange is some light switches in this 1950s house have a 3 core for two way switching, so I don't get why this particular switch is like this??


r/ukelectricians • • 23h ago

Can someone tell me what those red flashing lights mean? We had a small fire and the electrician keep saying there is nothing wrong.

136 Upvotes

We had a small fire immediately after an electrician replaced a socket that according to him was perfectly fine. Long story but basically we had 3 radiators break in the same socket.

So he changes the socket, leaves without testing and when we plugged in a radiator the socket goes up in flames. Then he left the wall like this while he went to buy another replacement socket and said again this was fine this time but now 2 days later none of the living room sockets work. The circuit trips at the consumer unit even when everything in the house is switched off.

Can someone help? I'm quite scared that this is dangerous. Are those red lights normal or is any of this normal?


r/ukelectricians • • 1d ago

How to find an electrician?

2 Upvotes

I'm new to the area, what's the best way you'd recommend to find a reliable sparky?


r/ukelectricians • • 1d ago

Getting formal

3 Upvotes

Hey, ive soent the past 16 years working kn the family trade as electricians and we would self certify whatever we we needed. The company was registered cps and id send the request to the office for approval with photos and it'll be done.

Well now, business is shut, the "boss", my grandad is dead. Everyone else got work elsewhere, different industries etc, and theres me with no paperwork to my name.

Anyone got any ideas where to start? We were commercial and industrial based but honestly, i just dont know where to even go


r/ukelectricians • • 2d ago

I had an second EIRC on a flat I just bought, am I screwed?

Thumbnail gallery
6 Upvotes

r/ukelectricians • • 2d ago

How do I become an electrician?

8 Upvotes

I am currently 15, in year 11, and am looking at multiple trades, I’m thinking about becoming an electrician however it’s not something set in stone, I need to apply soon if I’m going to do a course in college. Which type of course and route would I do to succeed? I don’t mind doing an apprenticeship but I don’t really have anyone I know who would be able to employ me, and that’s for any trade, so it would probably be hard to find one.


r/ukelectricians • • 2d ago

Whole-house UK KNX renovation: am I missing something with DALI, constant-current lighting and future-proofing?

Thumbnail reddit.com
3 Upvotes

Cross-posting because I’ve probably disappeared rather too far down the KNX/DALI rabbit hole. I’m renovating a whole house and would really appreciate a UK spark’s view on what is sensible at first fix, particularly centralised lighting, DALI vs home-runs, 5-core/shared neutrals, conduit and making the whole thing maintainable for whoever inherits it in 30 years.

PS - Our contractor hasn't yet introduced me to his sparky yet but I am trying to sense check my thoughts so as not to make them hate me from day 1!


r/ukelectricians • • 3d ago

Ideas for temporary tool storage?

2 Upvotes

I work for a company with van provided full of Milwaukee tools and pack out, sometimes jobs require us to go in one van, sometimes these jobs can be the full week or one day.
Anyone have any recommendations for storage so the night before I can throw in any hand or power tools I’ll need? Instead of lugging a full pack out and my veto backpack into an already pretty full van
Thanks


r/ukelectricians • • 3d ago

Advice for my upcoming sparky visit

1 Upvotes

I’m having a whole house rewire done, and I’ve got a date booked in now but I’ll be paying for half the job a week before, which seems fine after all he’s gotta get materials and whatnot.

My question(s) are if I’m paying him cash, would it be okay to ask for some kind of receipt or acknowledgement of the half payment now and the rest when completed?

And other than ripping up my carpets and moving out while they’re working, what else can I do to make their life easier?

Sorry if the questions are a bit dumb, first home first time having trades out


r/ukelectricians • • 3d ago

Anyone else reckon being on the books is actually better these days?

15 Upvotes

With the cost of vans, insurance, scheme fees, and most subbie day rates not stretching as far as they used to. Curious how lads on PAYE are feeling compared to those self employed or on CIS right now— is the steady wage + holiday + odd guvvy job winning out?


r/ukelectricians • • 3d ago

London and surrounding areas day rate.

3 Upvotes

Sparkys who are NICEIC/NAPIT REGISTERED. What’s your day rate these days? Domestic and commercial.


r/ukelectricians • • 3d ago

How much to change lights

1 Upvotes

As title says, replace 7 standard ceiling lights in a London flat. How much to charge


r/ukelectricians • • 3d ago

Immersion heater problem

Thumbnail reddit.com
1 Upvotes

r/ukelectricians • • 3d ago

NICEIC registration

2 Upvotes

So I've looked into registering to the NICEIC

I've only recently finished my apprenticeship and i will be about 6 months qualified (NVQ, AM2, 2391/52) and I'm working for a company atm

I've always wanted to go self employed but I wanted to do weekend jobs and jobs after work to learn the ropes of running a business and see how it goes before making the jump

Anyways long story short I've looked at NAPIT and NICEIC and they say you need 2 years experience before registering as a QS, will this stop me from registering with them as a sole trader for now?

I feel as though I'm being punished for trying to follow the rules if this is the case, I've lined up a lot of work doing an EICR every Saturday in the new year and I feel this could loose me all that work

Thank you for reading


r/ukelectricians • • 3d ago

RCD fused spur tripping after AC install?

2 Upvotes

Trainee Fridge/ac engineer here, normally used to installs in commercial environments with dedicated supplies installed for us but recently the company has branched out into domestics. Today's install was going great until switch on, we were supplied an external RCD fused spur to supply our condensing unit from a dedicated Garden supply circuit from a JB. System running fine until the compressor and fans started running up and after around 5 seconds of the compressor spinning up it tripped out at our RCD spur. Checked all connections, wiring and running voltages and couldn't find anything glaringly obvious. No other devices are connected to this circuit either as far as we're aware. Does anyone have any advice or guidance?