Hypothetical commercial inspection scenario.
**Location:** Virginia
**Applicable code:** 2021 Virginia Construction Code / Mechanical Code
**Project:** New commercial construction
A fire damper was installed in a duct penetrating a rated assembly.
The installation was coordinated on the drawings, and access was intended to be provided.
Then the ceiling was closed.
At the final inspection, the access opening is missing.
The damper cannot be reached for normal inspection or maintenance.
The mechanical code addresses access to fire and smoke dampers, including the ability to inspect and maintain them.
**Here's what I want to ask the contractors, inspectors, and project managers here:**
At what stage should this have been caught?
And what's the simplest coordination check that would have prevented the problem before the ceiling was closed?
Not looking to blame one trade. Interested in the actual process that works on construction projects.