I have been sitting on this well before the debate against the 0.5% Transit tax a few years ago, but with this latest development courtesy of our conniving, nepotistic city council,
http://globalnews.ca/news/3506156/metro-vancouver-mayors-council-to-release-details-on-charging-drivers-to-use-roads/
I’m having a hard time keeping shut. None of what I am revealing is a secret, it may not be shocking, and I’m not violating any contracts, but I want to get it out there.
Back in 2013, I worked for an outfit that installed A/V solutions in corporate and commercial settings. This often consisted of TVs, projectors, audio, PA, video conferencing systems etc. My task was to install systems for the offices of Translink and their police service.
In July-August of that year, I worked in the new Translink building in New Westminster, located across from Columbia Hospital and the Braid Skytrain Station.
As I remember, the building structure and my job sites were as follows:
2nd Floor: Transit Police
3rd Floor: Transit Police
4th Floor Translink Head Office
The 2nd and 4th floors are of particular interest as I will elaborate:
In my time on the 4th floor, I installed no less than six 70" and six 90" Sharp (LC-90) brand HD Smart TVs, as well as many smaller profile screens. I remember reading on inventory sheets that the 90" TV unit prices were around $8000.00 at wholesale rates, with the 70" tvs being most likely ~$5000.00. This was PREMIUM product, far from being big box store display fare.
These were installed in small meeting rooms, and became the INCREDIBLY expensive replacement for more cost-effective projector setups. Note as well that the excuse I was given was the connection issues when dealing with projectors made it Smart TVs an attractive sell as a “user-friendly” product. Anyone in the know is aware that connecting to a smart TV is NO different than a projector, and both can be as problematic. This was an upsell that the bureaucracy, high on its inflated budget, was more than happy to oblige.
In at least two large presentation rooms, we installed large Extron systems for the purpose of automating the simple action of lowering the projector screens and dimming lights. I have no cost analysis for these systems, but they are certainly not cheap. The screens measured approximately 20’x14.’ Motors included, I assure you, these assemblies are bloated in price.
I want to make clear: this is no hidden secret, you can visit these offices and see for yourselves, however no one seems to be aware. The second floor is the most obvious and where the most openly obvious tax-funded expenditures are viewable from the walkway to the Braid Skytrain station.
Distinguishable by its long windowed profile, revealing the entire complex to the outside observer, this is what I was made aware of as being the Translink Police-exclusive facility that spanned more than 1500 sq ft, comprising a fully equipped gym (rarely used), complete with sound system and around six premium 45” TVs for their entertainment. Attached was a “studio space” of around 200 sq ft, ostensibly for use as a Yoga studio, fully trimmed with mirrors, hardwood flooring and ballet barres. This is, I have to stress, exclusively for the use of Translink officials. I rarely saw anyone in the facility however.
Everything that might be found in a fitness club can be found in this gym. Funded on our backs.
Those are some of the details but others stick out: Despite the advent of many inexpensive and yet effective VoIP programs for conferencing and simple PC setups, Translink and the Police insisted on purchasing purpose-built software and hardware to use subscription video conferencing services. Further facilities for the Police services use included a 500 sq ft room, with a padded floor for combat training into which we also installed a sound and projector system. For “instruction.”
This company was taken to the cleaners by its project managers and contractors alike, and allowed serious overages to occur. I won’t speculate on potential conflicts of interest or corruption, but it goes without saying that the budgets, if ever made public, would be frightening in scope and scale. Waste had to have been monumental, and I can recall project managers for the site routinely increasing their spending and delaying deadlines to fix extremely minor issues, simply because crown corporations are unaccountable. I saw this even as I was out of the loop. The books most likely tell a much worse story.
Less than a year later, Translink declared the need for further public funding.
This is not some sort of call to arms, but consider this when the ever-encroaching Municipal and Provincial government talks about needing to create road usage fees and further taxes to fund more of their boondoggles. I wish I still had the pictures that I kept for some time as evidence, but could never find anyone to send them to, the opposition groups to the Translink tax years ago never gave out any contact info. Idiots.
To get political from my point of view, this is the unrepentant and unstoppable slippery slope of unrestrained socialist planning. This is only going to get worse. To hell with big government and their projects. Streamline it, limit it, and put the remaining power into direct democratic infrastructure. If they go ahead with any further attempts to both grow municipal, provincial, and federal legislative power, while creating a pseudo-privatized crown corporate structure, while charging us on both the supply-side and the sell-side (BC Ferries, Translink and more), we will have lost everything. And we will have funded our own starvation because some politicians made it sound charitable, and packaged it with other, more feel-good pieces of legislation.