It took me about 4-5 weeks. Most of it was spent trying to integrate a library to make a certain feature possible.
I wasted a lot of time trying to make it work. Eventually it did, but with some trade offs. I eventually realized it wasn’t worth it, and I was just stubborn trying to make it work.
I got rid of it, and since I did the development really took off, and I made significantly more progress, faster. I’d say the majority of the app was written in a few days.
Another really time consuming feature was the theme support. It took me a whole week (literally 1/4 of the time I was working on the app) to make it work. The tab navigator just didn’t wanted to switch theme with the rest of the app and it took me days to figure out how to trick the navigator to re-render without the user noticing.
Also, every part of the app was first designed in figma, then coded. So I’d say the time spent on coding vs designing was like 70 / 30.
2
u/exasperated_dreams Oct 31 '19
How long did it take to make?