r/github • u/inglenookyum • May 11 '24
i work on proprietary projects so my code doesn't get much love but i did want to share this with somebody... just notched a year straight.
94
u/TekintetesUr May 11 '24
I refuse to believe that someone would make meaningful contributions to real projects every day, including Christmas, new year, whatever.
0
May 11 '24
[deleted]
6
u/TekintetesUr May 11 '24
2 months is quite a lot. But to get to the point where OP is (or claims to be) you need ten more. That's insane. Being a workaholic is one thing, but doing something for 365 days in a row is unbelievable.
I don't doubt there are like a dozen people in the world who's capable of doing that, but come on.
5
u/mkosmo May 11 '24
The only way somebody does a year straight is with automated commits. Or they’re on the verge of breaking down and will wind up dead in a ditch before the next Reddit bot reposts their screenshot for karma.
1
u/SpaceboyRoss May 11 '24
Heh yeah, I contribute to FOSS stuff and work on my own FOSS projects almost daily. Currently at 2,846 contributions. It's hard but I have a job outside of this that doesn't involve programming so I get time off.
1
u/David_AnkiDroid May 11 '24
365 days isn't superhuman. A 'pip' on the contribution graph isn't necessarily a commit, it could be an issue added/code review.
That could only be 5/10 minutes a day. I have ~11 'blank' days in 2024, and if I cared about a 'full' heatmap, it would have been practically no extra effort to keep it full
1
u/TekintetesUr May 11 '24
Yeah probably not superhuman, but literally never taking a day off work isn't healthy, either.
Touch grass, man.
1
u/freezingStomachAche May 11 '24
I did this back in 2022 while maintaining a few open source repos that total up to ~40k stars. The result was severe burnout and pretty much 0 commits in the last few months of 2023 and I still haven't really recovered.
Coding wasn't the worst part. it was dealing with issues and the pressure that comes with expectations.
-1
u/TPIRocks May 11 '24
I worked a project, in the military no less, they wanted an "online system" (real time interactive timesharing) coded, tested and delivered in 90 days. I worked 12-16 hours per day, seven days a week for three months straight. This was all so a light colonel could get a full bird before retiring. He got his bird and all the credit, I hope he caught syphilis from the 2lt slut he was screwing. I really hope someone recognizes the project and who I'm talking about. What a prick you were colonel, but I'm not bitter.
41
23
May 11 '24
Backdated screenshot.
A full contribution graph isn't something to brag about.
It takes 10 minutes to write a script to autopopulate your contribution graph and make the graph look full.
2
u/Noones_Perspective May 11 '24
Is it not based on date? Or you mean a script to do it daily and the user hasn't actually done anything?
2
May 12 '24
You can make commits with dates that exist in the past, so you don’t even have to do it everyday, just make a script that does a years worth of commits
1
20
14
u/Commander_of_Death May 11 '24
That's not fucking real. This is real and I would go homeless before doing that bloody November ever again.
12
u/cyb3rofficial May 11 '24
that makes people less interested in profiles.
Looking at random projects on github, https://i.imgur.com/qsEaw85.png having stuff looking like that is more trust worthy than having a faded light hue block on every single day. If I ever needed hire another person, it's a huge huge turn off. It shows you only care about how something looks. It's almost like a mark of shame these days. Maybe if it was just a normal user account just having an account to have one and making like little artwork on it, sure go for it. Though if you are working on code, all this does is bloat the history and makes people less interested in your profile because they dont know what to look at.
22
7
5
u/PeteZahad May 11 '24
In your profile settings you will find the following option:
Include private contributions on my profile
So you can share your commit timeline publicly if needed.
1
3
u/Eminel47 May 11 '24
you can change commit dates any time, so you can take time and fill up a year easily
3
2
2
1
1
u/flurdy May 11 '24
My contribution graph was extensive for years (not as complete as the OP) but I am happy and proud that it has been going blank at weekends in the last few years. And completely blank/offline for 3-4 weeks during the summer holidays.
1
u/the_ajan May 11 '24
A silly question - how do people contribute to someone's code? What do you do exactly? The max I've done is fork/clone and play around with the code. (P.S I'm not a coder. I'm still learning)
3
u/Exciting_Majesty2005 May 11 '24
You don't need to contribute to someone else's code.
If you have a repository(e.g. for a portfolio, an app etc) and you add something to it(e.g. documentation, new code or basically anything) you "contribute". It doesn't have to be someone else's code.
1
1
1
-2
81
u/vitalik4as May 11 '24
Why the screenshot is so outdated? It's from 2020