Are these hangers upside down at this LVL / fascia board?
The joists are cantilevered out and the LVL is fastened to the ends using the hangers. Wouldn't it make more sense for them to be installed the top of the joists/trusses instead of from the bottom?
If you have weight coming down on the lvl, like a wall or roof assembly sitting on it then the hangers should be flipped. If the cantilever is there and no weight above (maybe a balcony w no roof) why use lvl and not regular dimensional lumber.
What is going to be above ? Balcony or just a roof? Pic dosnt show another level or more framing members. Maybe some low pitch rafters but even those might be small and not a serious weight issue. Regardless I would have flip them but a Struct Eng might say it’s all good ( prob it is )
Well, that's a wall on the left side and a walkable rooftop patio on the right side. There will be live load. Regardless I hope to hear back from the client about what the PE says here in a week or so.
This is wrong. There is not any uplift, only gravity, so it's not effective. The design of the seat and two flanges exists to support the next load, which in this case is the fascia board. IMO, the hanger is upside down, although there is not much load on the fascia board.
This was my thought as well. Wouldn't the uplift affect more the point where the 2x6 joists or the trusses are bearing on the exterior wall? Moreso than the LVL fascia board?
Alright, I'm mechanical, not civil. I still don't see wind being enough uplift force to warrant mounting the joist hangers in that orientation. Educate me, if you are inclined. Thanks.
Is there a wall on top of the LVL? I'm having a hard time why they didn't just use a rim board, the only thing I can figure is that they needed a double LVL so they would have continuous support for the bottom plate of a 2x4 wall.
In that case, that's a good observation about the hangers being upside down. Hopefully those were spec'd out by ignoring the seat and treating them as clip angles.
But if the load is well under the listed uplift capacity, I’ll spec out standard hanger configuration just because I don’t want to get a call from the jurisdiction that “they didn’t invert the hangers, we need a document describing the fix”. Contractors miss stuff all the time, sometimes it’s easier to assume they will do that and move on. See: Including hard-to-find notes for post-installed anchors while detailing for cast in place. I can’t tell you the number of times I’ve gotten calls about contractors missing shear or exterior wall anchors; I point them at “note 15 of detail 18/S1.2” (install x” anchors of type z with y” embed at half the listed spacing”) and move on with my day.
You should hire me to come out and inspect your residential framing jobs next time.
This is a gorgeous house, just shy of 7,000 square feet, and I think there was just over 60 individual deficiencies I called out and believe it or not, the framers that are really good job overall.
Cantilevered Deck. Most of the multifamily in my area uses a detail similar to this... The one beyond is almost certainly a deck, although I can't see the hangers on that one.
The hangers are installed correctly. We don't know what/how the rest of the structure is designed for so we can't say if they are the right connector for that application.
The rim boards here are not LVL. If you zoom in where the top arrow is pointing you see the wood grain pattern of dimensional lumber. What you don't see anywhere on the rim is the "laminations" that should be visible on the edge of LVL.
Again, we don't know how the rest of this is put together so we can't say if the materials selected are appropriate for the required loading.
But just spitballing it’s very possible each joist end is a support condition for the lvl given their cantilevered w/ a backspan. In that case the lvl is “hanging” from each joist end, essentially continuously supported. And that would require the hangers to be installed upside down (which wouldn’t be an uplift load)
You got a couple things to think about. The bending moment for gravity loads becomes a positive moment on the cantilever. But to meet the inch and a half bearing code you can turn the connector upside down. I've never seen a code that there's a bearing required for uplift so you're just basically reversing the direction of the loads. The seat of the connector doesn't do much of anything except strengthen the connector in an uplift situation but the published figures are always less for uplift versus download. The download has the bearing of the seat.
No you are correct the moment results reversed at the cantilever resulting in an upward Force for gravity loading which if I remember has more of a long-term load rating then wind and uplift.
Yes because then the seat is providing more bearing area for gravity loading. In this configuration you have to use the uplift figures and not the gravity figures. The way it is now it's just the nails and sheer which is a violation of the building code and that you're supposed to have an inch and a half bearing for gravity loads for wood members. But this is a technicality I've never seen addressed except here: https://www.eng-tips.com/viewthread.cfm?qid=454557
So it looks like this is just an overhang for son and that kind of thing not a live load of people so it's not going to really make that much of a difference how the hanger is because the nails will end up in shear.
Well, there's a room on the left side and a roof patio on the right. I suppose that and the fascia is up on the top level and won't have any live load but the wall bracing plan has the entire exterior designated as shear wall. So I dunno. I'm just an inspector. I hope to hear back from the client after the EOR reviews my report...we'll see what he says. Maybe much to do about nothing.
So many people giving op free engineering consulting. Where’s our friend that does that typical comment post? We need to stop helping random people that come in here.
Yeah sorry, didn't mean to upset the flow on this sub. I figured I might get more interesting answers here than over in r/buildingcodes or r/construction.
What interests me is that the concealed flange hanger is only nailed on one side. They cut the rim about an inch short, so the nails on that side aren’t nailed to anything
Haha, yeah. Everyone was focused on the question you were asking about. The EOR may have spec’ed the hangers inverted or not, I can’t say. But what I do know is that the EOR definitely did not spec that LVL to be cut short. How big of a deal that is, again, can’t say. It’s just a shame.
If those are LUS210-2, they each have a 1445lb uplift capacity. HUS210-2 have 3270lb uplift capacity. Those are with 1.6 Cd though so for dead/live you would want to reduce those a bit
Personally I don't like using joists cantilevered like that...even if the numbers check out you can get a hump in the floor when they try to deflect.
So, I can't make out whats going on at the ends of the LVL, but I would have tried to support each end of the LVL (maybe with cantilevered LVLs LOL) and shown the hangers like they were installed here
I don’t like having joists cantilevered like that either. What are some better solutions? Im an architect who lurks here, It helps to hear these things and learn.
I like the way your drawings look. Very clean. How do you specify the fastening for all of your built-up LVL's? I have started using solid members more because I couldn't figure out a way to specify fastening for the LVL's efficiently and so the contractor wouldn't mess it up.
Basically we've got a schedule in our details page that reads something like '2 ply LVL use these nails or these screws or these bolts' '3 ply lvl use these nails or these screws or these bolts' and some notes saying to add an extra row of fasteners beyond a certain beam depth, add some fasteners for side loaded point loads, and 4-5 ply side loaded beams require a specific detail
If it was me I would have had a cantilever 2 or 3 ply LVL beam replacing the joists at each end of the row of joists, and probably another cantilever LVL at the midpoint, supporting the perimeter beam with an inverted hanger, or by extending the cantilevers to the outside sheathing through the perimeter beam and attaching the perimeter beam to the cantilevers with concealed flange hangers
I feel better relying on LVL's cantilevering than 2x's
Okay thanks yeah i like that a lot more, LVLs are far more dimensionally stable. Im primarily concerned with the long term sag and shrinkage that can lead to failure of the waterproofing details, and still somewhat concerned with cracking and movement in the finishes.
do y'all just downvote every architect that comes here? if so that's fair...
Yeah I don't know much about waterproofing details but I know that if we are cantilevering a porch or something exterior we definitely show it the way I suggested so that there would only be 2-3 beams protruding through envelope to worry about flashing, if you rotate the joists 90 degrees they wouldn't each have to be flashed around
There are some ornery people on here for sure lol. I think a lot of people get frustrated with the architects they're working with but can't smart off to them, so they fuss about them here anytime they're given the opportunity
i mean we are known to have absurd requests and seemingly try and make your job as hard as possible with no reason. I get along great with my engineers because i come from a background in construction, and during schematic design i leave plenty of room where i know there will be structure and MEP. If you guys use it all up then that's fine, if there's leftover space i get to tell the client that i was able to find them some additional leaseable SQft without increasing the building cost.
typically under the cantelever im not so worried about waterproofing, but nowadays we do have tightly sealed envelopes so less penetrations thru the vapor barrier is helpful, however in cases like this that floor will be insulated and the vapor barrier wraps along the bottom of the deck.
The ends of the LVL are face nailed to another LVL which makes up the next fascia.
So, dummy question here: when Simpson tabulates their uplift values in a typical application, is it uplift of the ledger or the joist? The hung or the hangee, in engineering speak?
The hanger doesn't know which member is the hung member and which is the hungee.
The hanger just knows that there is x force being transferred through its nails and metal
If you are comfortable with inverting the joists and letting the perimeter element load the cantilevers (backwards from typical loading scenario) then doing the same for the uplift values should make sense too
I thought that framing components had to bear on a minimum one and a half inches of wood or metal? In this case, the LVL is not bearing in the seat of those hangers, huh?
But then again, that's why I'm here trying to get some professional insight because you all know better than I do.
Following your same train of thought, the perimeter beam isn't supported by bearing here, and wouldn't be supported by bearing with inverted hangers either.
Yes there would be bearing of the hanger to joist if they were inverted, but the perimeter beam is supported by nail shear and no bearing
Ideally yes timber is supported by bearing. That would be a 'prescriptive' requirement and should be followed unless an engineer is involved to make a judgement otherwise based on engineering analysis
I've seen this kind of detail not even tie back into the house flooring just cantilever off the outside with an upside down bucket. It looks pretty beefed up to me.
I'm not sure if this is a rim board either... I think OP is saying that the load bearing wall is above the beam, not the ends of the joists.
A lot of people are giving advice as if the only weight is the self weight of that beam, because OP didn't include an overall photo... Depending on the true configuration of the framing, I fear that OP may get a lot of responses based on inaccurate assumptions.
To OP, I think you should also be concerned about the connection on the other end of the backspan. That has the potential to see a lot of uplift if the overhang is loaded more than the backspan. Still, a lot of hangers have uplift capacity. I may be wrong, but I've only seen hangers that are to be screwed on both faces. The screws on the face of the beam will resist the joists from going down. The screws on the face of the joist will resist the joists from going up. There are usually less screws on the hanger face of the joists (and no seat at the top of course), so the uplift capacity is usually less than its downward load capacity, but it should have some kind of capacity. Contact EOR.
I thought a ledger had framing components supported from it, in this case the "ledger" is being supported by the joists / trusses. Wouldn't that just make it a fascia given its location? It wouldn't that change the orientation of the hangers since their job is not to hold those cantilevered joists in place but hold up the LVL?
Is the load bearing wall above it bearing on it? Or is it bearing on the ends of the joists? If it's the former, it's definitely NOT a fascia board. If it's the latter, it's a rim joist and the reaction loads there shouldn't be significant.
Again, if it's the former, I would actually consider it to be acting more as ledgerboard, too (not quite... because ledgerboards transfer point loads (concentrated loads) and whatever this is is transferring a uniform load). But yeah, it isn't supported at either end of it, so the load from the wall above it would be transferring load directly to the joists, just as a typical ledgerboard is just used to transfer load between two structural elements without carrying much stress itself since the bracing points are so close together typically.
I think that so long as the hangers are rated for the upward reaction determined by the EOR, it's ok.
Fascias aren't meant to hold up any kind of significant load bearing elements. Fascias are essentially just aesthetic trims.
Here is a quick pick of the exterior that might give it a bit more context. The left side is a cantilevered wall and the right side is that sort of facia with a rooftop deck.
No. Based on the picture, you don't know if its fine because you have no idea if there is a wall and roof above it, hell there could be another floor and then roof up above. Based on the picture you have no idea if its fine
If its the other way round, do you get to use the "uplift" values for your load? I am assuming the connector is designed for the load given, regardless what it is.
18
u/Cosmo_MV May 09 '24
If you have weight coming down on the lvl, like a wall or roof assembly sitting on it then the hangers should be flipped. If the cantilever is there and no weight above (maybe a balcony w no roof) why use lvl and not regular dimensional lumber.