r/StructuralEngineering • • Jan 24 '24

Structural Analysis/Design What does this symbol mean?

Post image
0 Upvotes

69 comments sorted by

164

u/The_Vitruvian_TPM Jan 24 '24

Slope of the roof. Whatever you're doing, be sure to ask for help from some folks on your team with experience. Best luck to you!

49

u/Momoneycubed_yeah Jan 24 '24

There are 2 kinds of engineers. Ones that don't know and ask and ones that don't know and flounder. We all don't know some stuff. Be somebody who asks questions!

6

u/BIGNASTY201 Jan 24 '24

Thank you, so many inflated egos on this app

1

u/mango-butt-fetish Jan 25 '24

I wouldn’t take offense to it. I agree and disagree with everyone. I do agree you should definitely learn this in the basics of your career/school. I also disagree with giving you a hard time because you asked and asking is always important.

1

u/fltpath Jan 25 '24

There are far more issues with that detail than a slope indicator....

26

u/3771507 Jan 24 '24

Yes but that's the most basic thing there is in construction and design.

4

u/ShutYourDumbUglyFace Jan 24 '24

IDK, in roadway slope is presented backward (at least in all the states I've worked in). As in a 2:1 slope is 2 horizontal to 1 vertical, but the definition of slope is literally rise over run. I can see how that, specifically, can be confusing.

2

u/caramelcooler Architect Jan 25 '24

Do you have an example? I’ve never seen this, always figured rise over run was universally accepted.

2

u/ShutYourDumbUglyFace Jan 25 '24

https://www18.swfwmd.state.fl.us/Erp/Export/ViewDoc/s4jrd4rf.pdf - middle left detail

Caltrans Standard C7C also has it called out this way, but that detail isn't quite as easy to reference.

The backfill on these ADOT Standard Walls is shown as 2:1 max: https://azdot.gov/sites/default/files/media/2022/01/SD-701-All.pdf

I'm sure there are more examples out there.

2

u/caramelcooler Architect Jan 25 '24

Thank you! This is interesting.

2

u/3771507 Jan 24 '24

Yeah I never realized that. Handicap ramps or 1 to 12. But in this case it showed the rise to run symbol.

1

u/fltpath Jan 25 '24

Handicap ramps are a maximum slope of 1:12...you can have a lessor slope of it works better.

→ More replies (2)
→ More replies (4)

1

u/mrizzerdly Jan 25 '24

I'm in neither (Facilities) and I knew that was slope.

1

u/fltpath Jan 25 '24

Asking the posters here with all of the witty comments one question:

If you are the fabricator, what is the length of the W8x10 you would supply to the field?

1

u/fltpath Jan 25 '24 edited Jan 25 '24

Actually, this is a shit detail.

Forget the slope indicator...(its backwards anyways)

The only dimension leaves the fabricator to determine the material lengths. What is the length of the W8x10?

1/4" field weld at top of W8 is not correct..this should be 3/16'

connection between the W12x40 and W8x10 is not dimensionally correct (a12x40 is 8" wide, and a W8x!0 is only 7.9 inches deep...not 10" deep as shown)

Dimension like 10-1/8" and 4' -10 7/8" are measured horizontally to the slope, not with the slope...these are meaningless.

the plate 35...how attached, and projects through?

the dimensions of "R" panel 4" on one side...undefined on left side

why are C sections face inward, not outward. ? How are these attached? welded in the shop or field?

this detail is either not constructible, difficult to impossible to fabricate, and/or leaves too many places for a fail.

89

u/shimbro Jan 24 '24

Bring two 12 inch pizzas for the crew

1

u/fltpath Jan 25 '24

and a change order from the fabricator

14

u/ExceptionCollection P.E. Jan 24 '24 edited Feb 21 '26

This post was mass deleted and anonymized with Redact

continue dependent rhythm practice languid chunky waiting judicious decide wide

-36

u/yashman_13 Jan 24 '24

Its weird the 12 is written on top of the hypotenuse of the triangle

23

u/ExceptionCollection P.E. Jan 24 '24 edited Feb 21 '26

This post was mass deleted and anonymized with Redact

square expansion profit quiet cagey truck flowery light chop shocking

3

u/mango-butt-fetish Jan 25 '24

I just came here to say… BRUH

10

u/juha2k Jan 24 '24

Why it is not marked up as 1:6?

41

u/mmodlin P.E. Jan 24 '24

It’s conventional to show roof slopes in a ‘per foot’ format in the US.

17

u/juha2k Jan 24 '24

Ah, thank you. Am obviously not familiar with freedom units. TIL 12 inches is exactly one foot lol.

13

u/[deleted] Jan 24 '24

I've never actually counted, but I believe this is because in Fre3domland we have 12 toes per foot, obviously.

1

u/JCCampo Jan 24 '24

Put down the glowy green kool-aid buddy.

4

u/Kruzat P. Eng. Jan 24 '24

12 is a highly composite number, it's easily divisible by many other numebers. Roof slopes are almost always a factor of 12, although not always a whole number (7.5/12 for example)

8

u/unique_username0002 Jan 24 '24

Only in imperial though... Never seen that in metric

1

u/Kruzat P. Eng. Jan 25 '24

Ah, yes that's a good point!

1

u/skyandceiling Jan 24 '24

Said aloud it is "two over twelve" or "two-twelve" – it's mathematically the same as "17%" but the roofing supply house is going to look at you real weird.

2

u/ShutYourDumbUglyFace Jan 24 '24

12" horizontal to 2" vertical - it's the slope of the roof.

3

u/froggeriffic Jan 24 '24

That is the rise and run of the slope of the roof.

1

u/micah490 Jan 24 '24

Pitch

1

u/mango-butt-fetish Jan 25 '24

What you called me?

1

u/Evo_Effect P.E. Jan 24 '24

I see I'm late to the party...

That is the pitch (or slope) of the roof structure.

1

u/willthethrill4700 Jan 24 '24

The slope of the roof

1

u/Objective_Sir3074 Jan 24 '24

It shows roof angle 📐

1

u/WideFlangeA992 P.E. Jan 25 '24

It’s the required wedge size.

You will have to use the law of wedges to check the steel

1

u/Braner_310 Jan 25 '24

It's obvious man.

1

u/FunKey6432 Jan 25 '24

Slope of the beam. It is 2/12 downwards

-23

u/Ok-Key-4650 Jan 24 '24

Couldn't he just put an angle down there lol

20

u/MoreMooses P.E. Jan 24 '24

2:12 reads better than 9.46232 degrees

1

u/ChocolateTemporary72 Jan 24 '24

What about 1:6

14

u/MoreMooses P.E. Jan 24 '24

That's still 9.46232 degrees

1

u/Procrastubatorfet Jan 24 '24

The end dim of 4 looks twice the 2 .. so I reckon they've just drawn the triangle big enough to see and dimensioned it at the same scale as the drawing.

Just a tad quicker and less scope for error in the drafting

1

u/Ok-Key-4650 Jan 24 '24

In fact that's not even needed you already have angular distances

3

u/MoreMooses P.E. Jan 24 '24

That's how you get an RFI from the contractor asking for the pitch. Better to just provide upfront.

1

u/Ok-Key-4650 Jan 24 '24

What's an RFI? (I'm not a native English speaker) but I don't know about you guys but h every contractor I've worked with has his own site engineer so no problem in this aspect for me

1

u/MoreMooses P.E. Jan 24 '24

RFI is Request For Information. Just and official way for contractors to ask architects and engineers questions. But can they calculate it? Yes. Will they? No.

5

u/Enginerdad Bridge - P.E. Jan 24 '24

Slopes are more intuitive in the real world. If the slope is 2:12, that 2" of rise for every 12" of run, or 2" per foot. For say an 8' span, that's 2" per foot x 8', for 16" of rise. You need trig to do that with a run and an angle.

-1

u/Ok-Key-4650 Jan 24 '24

I know how it works but you don't even need it i''this case you already have the highest and lowest point

1

u/Enginerdad Bridge - P.E. Jan 24 '24

The height to the highest point isn't dimensioned.

4

u/JarkJark Jan 24 '24

Not a fan of precision?

3

u/WhatuSay-_- Jan 24 '24

Sig fig nightmare

1

u/Marus1 Jan 24 '24

It's easier to now calculate the height difference ... meaning to calculate what a height of a wall would be in the middle

0

u/[deleted] Jan 24 '24

[deleted]

5

u/OptionsRntMe P.E. Jan 24 '24

Did you size it? I’d be more concerned about torsion on the W12 if anything