r/StructuralEngineering • u/BIGNASTY201 • Jan 24 '24
Structural Analysis/Design What does this symbol mean?
89
14
u/ExceptionCollection P.E. Jan 24 '24 edited Feb 21 '26
This post was mass deleted and anonymized with Redact
continue dependent rhythm practice languid chunky waiting judicious decide wide
-36
u/yashman_13 Jan 24 '24
Its weird the 12 is written on top of the hypotenuse of the triangle
23
u/ExceptionCollection P.E. Jan 24 '24 edited Feb 21 '26
This post was mass deleted and anonymized with Redact
square expansion profit quiet cagey truck flowery light chop shocking
1
25
3
10
u/juha2k Jan 24 '24
Why it is not marked up as 1:6?
41
u/mmodlin P.E. Jan 24 '24
It’s conventional to show roof slopes in a ‘per foot’ format in the US.
17
u/juha2k Jan 24 '24
Ah, thank you. Am obviously not familiar with freedom units. TIL 12 inches is exactly one foot lol.
13
Jan 24 '24
I've never actually counted, but I believe this is because in Fre3domland we have 12 toes per foot, obviously.
1
4
u/Kruzat P. Eng. Jan 24 '24
12 is a highly composite number, it's easily divisible by many other numebers. Roof slopes are almost always a factor of 12, although not always a whole number (7.5/12 for example)
8
1
u/skyandceiling Jan 24 '24
Said aloud it is "two over twelve" or "two-twelve" – it's mathematically the same as "17%" but the roofing supply house is going to look at you real weird.
2
3
1
1
u/Evo_Effect P.E. Jan 24 '24
I see I'm late to the party...
That is the pitch (or slope) of the roof structure.
1
1
1
1
u/WideFlangeA992 P.E. Jan 25 '24
It’s the required wedge size.
You will have to use the law of wedges to check the steel
1
1
-23
u/Ok-Key-4650 Jan 24 '24
Couldn't he just put an angle down there lol
20
u/MoreMooses P.E. Jan 24 '24
2:12 reads better than 9.46232 degrees
1
u/ChocolateTemporary72 Jan 24 '24
What about 1:6
14
1
u/Procrastubatorfet Jan 24 '24
The end dim of 4 looks twice the 2 .. so I reckon they've just drawn the triangle big enough to see and dimensioned it at the same scale as the drawing.
Just a tad quicker and less scope for error in the drafting
1
u/Ok-Key-4650 Jan 24 '24
In fact that's not even needed you already have angular distances
3
u/MoreMooses P.E. Jan 24 '24
That's how you get an RFI from the contractor asking for the pitch. Better to just provide upfront.
1
u/Ok-Key-4650 Jan 24 '24
What's an RFI? (I'm not a native English speaker) but I don't know about you guys but h every contractor I've worked with has his own site engineer so no problem in this aspect for me
1
u/MoreMooses P.E. Jan 24 '24
RFI is Request For Information. Just and official way for contractors to ask architects and engineers questions. But can they calculate it? Yes. Will they? No.
5
u/Enginerdad Bridge - P.E. Jan 24 '24
Slopes are more intuitive in the real world. If the slope is 2:12, that 2" of rise for every 12" of run, or 2" per foot. For say an 8' span, that's 2" per foot x 8', for 16" of rise. You need trig to do that with a run and an angle.
-1
u/Ok-Key-4650 Jan 24 '24
I know how it works but you don't even need it i''this case you already have the highest and lowest point
1
4
1
u/Marus1 Jan 24 '24
It's easier to now calculate the height difference ... meaning to calculate what a height of a wall would be in the middle
0
Jan 24 '24
[deleted]
5
u/OptionsRntMe P.E. Jan 24 '24
Did you size it? I’d be more concerned about torsion on the W12 if anything

164
u/The_Vitruvian_TPM Jan 24 '24
Slope of the roof. Whatever you're doing, be sure to ask for help from some folks on your team with experience. Best luck to you!