r/RocketLab • u/Royal_Platform_6754 • 11d ago
NASA CLPS 2.0 Source Selection Statement released with RocketLab technical acceptability rated "Unacceptable"
https://sam.gov/workspace/contract/opp/c0f826659fd041a680e7d14b771bb824/view
Rocket Lab USA, Inc. (Rocket Lab) submitted its proposal under Pathway 3: Space Flight Heritage. Based upon the evaluation, Rocket Lab’s proposed approach to Pathway 3 was determined to be Unacceptable. The Rocket Lab proposal demonstrated that Rocket Lab acted as the primary contractor and operator of the Escape and Plasma Acceleration and Dynamics Explorers (ESCAPADE) mission. The proposal provided traceable evidence demonstrating that the mission met the 24-hour mission lifetime requirement as well as demonstrating that the ESCAPADE mission was a highthrust spacecraft with at least one engine capable of generating greater than 90 lbf. The proposal also provided traceable evidence demonstrating how the ESCAPADE mission validates the technical maturity of all core competencies (avionics, propulsion, and integration) required for lunar delivery. However, the proposal did not include adequately detailed mission descriptions for the ESCAPADE mission, including lacking information on the overall mission design and operational approach. This lack of an adequately demonstrated, valid approach introduces an unacceptably high risk to the government for future delivery task orders and does not meet the requirements of the solicitation. Per RFP Section M.1(d), if any element of the evaluation factor is unacceptable then the overall pathway will be determined unacceptable. Thus, Rocket Lab’s proposed approach was determined to be Unacceptable.
22
u/christina_siun 11d ago edited 11d ago
You don't win every RFP - this is for lunar landing capacity I believe ... does RKLB focus on that?
6
u/RedLotusVenom 11d ago
I mean, they should have the talent recruited to answer these questions. This is the company that tried to justify a smallish budget Mars sample return mission. That’s a way bigger challenge than a lunar landing. If their conops didn’t adequately define the mission then that’s a pretty big proposal team miss.
0
u/hyperproliferative 10d ago
Tell me you’ve never been through a procurement RFP without telling me
2
11
u/MissionSuccessLife 11d ago
This is good feedback for RKLB to receive. I am confident they will learn and make the proper adjustments. There will be many more missions to come.
12
u/Key-Beginning-2201 11d ago
Firefly rising
10
18
11
u/Axolotis 11d ago
How the fuck is Blue Origin “explodes on pad” technically acceptable!?!
39
u/ArtOfWarfare 11d ago
New Glenn has flown a few times and has a planned return to flight in the next few weeks.
Neutron has never had a multi-engine static fire or been stacked.
2
u/RocketVerse 11d ago
Technically a few months but regardless
0
u/ArtOfWarfare 10d ago
I’d define somewhere in the 10 weeks to 3 months range as when you transition from saying a few weeks to a few months.
AFAIK January is the target so I’m counting it as a few weeks.
I’m not invested in Blue Origin so I don’t pay all that close attention to them. They’re not public and up until New Glenn was flying, I valued them at about $0… I haven’t reevaluated them since it’s started flying. Again, not mattering since they’re not public.
1
u/Dieseltrain760 10d ago
My Blue stock grants are valued at $14.50 per share internally and reflected in my Fidelity account.
1
u/desertdodo123 4d ago
10+ is not “a few”
1
u/ArtOfWarfare 4d ago
It’s more than “a couple” and less than “several”. This article on the phrases gives an example where “a few” means as much as 12:
https://www.dictionary.com/articles/few-vs-couple-vs-several
1
u/Serious-Kangaroo-320 10d ago
new glenn rtf is delayed to "early next year" per an email from limp
3
u/ArtOfWarfare 10d ago
There’s only 6-7 weeks left in the year. Even late January qualifies as “next few weeks” for me right now.
7
u/Vox-Machi-Buddies 11d ago •
![]()
They have an HLS contract. I'd be more worried if NASA had to come out and say that a company they had chosen to land humans on the Moon didn't have the technical acumen to land cargo there too.
4
1
u/Bernese_Flyer USA 10d ago
It qualifies under a different pathway - the one that requires designing, integrating, and building a lunar lander that has completed full testing.
0
-18
u/Key-Beginning-2201 11d ago
For the same reason starshit explodes after launch was.
Grow up and learn a little about the industry instead of being a fan boy.
2
u/Responsible-Cut-7993 11d ago
There is a certain art to how these proposals are put together. There could be some gaps within RKLB for how these proposals are put together so they show properly the technical competence of the company.
1
u/Chill-more1236 11d ago
I agree and large caps should have ample access to the cream of the crop in proposal writing.
Unless a nepo baby/English major armed with chat gpt & free MS Office cloud qualifies
2
2
2
1
u/The-zKR0N0S 11d ago
Can you give context regarding what this is?
9
u/darkmatterhunter 11d ago
Contractors like rocketlab are evaluated by a third party (usually an FFRDC) based on requirements the government has and the third party then does ratings/source selection and hands it off to the government as a recommendation. I’ve been employed on both sides and it can be brutal.
1
u/The-zKR0N0S 11d ago
I mean more of, what is this evaluation for? What program? What stage are they in before picking a horse? Was the issue that made the submission unacceptable something that can be fixed?
4
1
u/Hot-Problem2436 10d ago
If you guys look at the companies that were acceptable, you'll see that they are almost all focused on lunar landing or supporting that. Rocket Lab probably submitted, but since they haven't built any lunar landers or have equipment capable of getting something to the moon, they aren't the right fit here.
-3
u/HighLighten 11d ago edited 11d ago
Someone should ask Jared issacman if it makes more sense to block a company proposal simply because they didn't adequately describe the escapade mission "design" & "approach" they did for NASA (they should be well aware of their own mission), or instead just ask them for more clarification on it.
This is exactly the kind of BS that's holding NASA back, turn down proper proposals due to lack of paperwork which NASA no doubt has in another division.
Edit = add in "escapade" for clarity and fix typo
-2
u/1foxyboi 11d ago
Maybe he’s already mad we are challenging them legally on MTO. Why be friendly towards us when we went after him?
3
58
u/burmese_python2 Holder of many shares 11d ago
Because they do not have flight assets that qualify for this.