My dad told me the story of how his first wife was an architect and she’d intentionally leave one mistake in her designs for her boss to find, because he had a compulsion to change at least one thing. She referred to it as him (the boss) needing to piss on the design
(Edit to clarify who is doing the pissing)
Edit 2: at least 8 people have commented with the duck story already
At my old job I was in charge of putting together a major quarterly report that went to all of the executives. One of the things my manager taught me was that if any numbers come out round, fudge them by a few cents. For example, if the average order value for a particular segment came out to $110.00, we'd adjust it to $109.97.
Our CEO was an accountant by trade and if he saw round numbers, he assumed that people were inserting estimates, and he'd start tearing apart the rest of the report (figuratively) looking for anything that might confirm his conclusion, and always leading to a ton of extra work for us.
I have to submit mileage for work- I do the same thing- if they see my round trip was 40 miles I get an email asking me to screen shot my gps route because they assume I rounded up if I just put it at 39.7 or something no such email and the way our reimbursement for miles gets calculated the company will round up 39.7 to 40 anyway so no harm and completely asinine that I should have to do this.
You expect me to believe such an oddly round number? You're probably rounding 64.37376113703 to the centimeter just because you don't want to handle numbers that are precise! What are the odds it would come out to exactly that number? Zero! Now go back and calculate it right!
Happened with mount everest room first person that measured it had the height come out to a really round number and fused it by a couple inches to make people think he didn't round/fudge
I work with financial numbers all day every day as a statistician and it blows my mind that anyone who works with numbers would assume a nice round number is a sign of something being amiss.
I view tens of thousands of excel cells containing numbers every day, I probably pass by winning lottery ticket combinations on a regular basis lol.
Is there a name for this? We need a noun like "malicious compliance", but for deliberately making easy to spot, minor mistakes to avoid overbearing regulation/interference.
This started as a piece of corporate lore at Interplay Entertainment. It was well known that producers (a video game industry position roughly equivalent to project manager) had to make a change to everything that was done. The assumption was that subconsciously they felt that if they didn't, they weren't adding value.
The artist working on the queen animations for Battle Chess was aware of this tendency, and came up with an innovative solution. He did the animations for the queen the way that he felt would be best, with one addition: he gave the queen a pet duck. He animated this duck through all of the queen's animations, had it flapping around the corners. He also took great care to make sure that it never overlapped the "actual" animation.
Eventually, it came time for the producer to review the animation set for the queen. The producer sat down and watched all of the animations. When they were done, he turned to the artist and said, "That looks great. Just one thing: get rid of the duck."
My manager feels this urge. I think the move from dev to management is a hard one because you go from very tangible work- putting code down into the repo - to doing like 5% of the work on four dozen different things at a time. If you spend 5 hours of the day in meetings listening to other people talk, reviewing that PR (or building plan!) could be the only tangible contribution of your whole day.
Usually it's a minor design issue rather than a mistake, so it's a worthwhile discussion anyway
At least that doesn't cost much -- but it gets worse.
My (small) town outsources their building inspections. So the builders (the smart ones) leave some easy to correct code violations in at the first inspection, because they know the inspecting company will always find something that needs correction no matter what. So it takes an extra couple of months and some money at the end of construction to do the "fix the obvious errors" dance, all so the inspectors can look good to the town.
What happens if the inspectors don't correct one of the mistakes? Do the builders just correct it anyways, or is it small enough that they just leave it?
I think you mean if the inspectors don't catch one of the mistakes. On my project they all got blue taped and corrected (along with a bunch of my own issues) before the 2nd inspection, which then passed. The inspectors reputation is only to fail the first one.
I am consciously deciding to take it on faith that any important code problems would still get flagged on a 2nd inspection... I have to live here after all!
There's some PM / techie lore about the "bike shed" or "bike shedding" (as a verb) based on an engineering trope that you can get a group to approve plans for an entire nuclear power plant fairly smoothly, but if you try to get them to agree on what color to paint the bike shed, they'll argue for weeks about it.
2.1k
u/BeauteousMaximus Mar 09 '21 edited Mar 10 '21
My dad told me the story of how his first wife was an architect and she’d intentionally leave one mistake in her designs for her boss to find, because he had a compulsion to change at least one thing. She referred to it as him (the boss) needing to piss on the design
(Edit to clarify who is doing the pissing)
Edit 2: at least 8 people have commented with the duck story already