r/Metrology • • Jul 04 '20

This sub isn't focused on real Metrology

1 Upvotes

This sub should be renamed Precision Dimensional Inspection and GD&T rather than Metrology, as the posts of this sub are focused on that topic rather than real metrology, which focuses on calibration and compensation of all inspection, measurement and test equipment.


r/Metrology • • Dec 23 '24

Lead CMM Programmer Needed - Houston - $40 per hour

0 Upvotes

We are looking for a CMM programmer to join our team and lead the CMM department.

Candidate needs to have extensive experience using Zeiss Calypso, expert level GD&T skills, and strong communication skills. Experience in the aerospace manufacturing industry is strongly preferred.

Candidate will be responsible for generating and maintaining organization of CMM programs, mentoring/training a junior level CMM programmer, filing out dimensional inspection reports, generating inspection plans, and will be responsible for the overall quality of CMM inspections. This is a management level position.

Pay is $40 an hour, with lots of overtime opportunity. We are open to salary options as well if that is preferred. We work roughly 40-60 hours per week depending on shop workload. Schedule is M-F starting at 6am.

Boss has requested that I not post the name of the company in the ad, but I will be happy to provide more information to anyone who reaches out.


r/Metrology • • Aug 05 '25

"Measured in a constrained state," The fuck all of accountability?

1 Upvotes

How do I show part is out of spec when we have a "measured in constraint state not exceeding 100 N" callout is on the print. We do not have a fixture to constrain the part only the supplier has one.

  • USE A, B, C, D, E AND F AS SUPPLEMENTAL CLAMP LOCATIONS WITH MAXIMUM CLAMPING FORCE OF 100 N

  • ALL DIMENSIONS TO BE CHECKED IN CONSTRAINED CONDITIION. (ie GOOO FUCKYOURELF!)


r/Metrology • • May 16 '26

Really torn between two engineering jobs and my partner’s reaction to one of them (defence industry)

1 Upvotes

Apologies in advance guys, not trying to spam with personal content but just felt I can get insights from people who do the same work/those I can relate to.

I’ve recently interviewed for two inspector roles in the UK and I’m genuinely torn between them for very different reasons.
Company 1 is a huge defence manufacturer. The interview honestly fascinated me. They had one of the biggest double-probe gantry ZEISS CMMs I’ve ever seen, loads of advanced equipment, strong training culture, opportunities to travel to Germany/France for knowledge exchange, and pathways into production/manufacturing engineering or quality engineering later on. The first CMM I ever touched in my career was a ZEISS, and working in defence/aerospace environments was always something I admired growing up in India. The company is also very established, close to home, good salary/benefits, early finishes, solid work-life balance etc.
Company 2 is almost the opposite. Smaller medical/moulding company, tiny team, highly specialised work with nano-level surface finishes, long hours but flexi culture/overtime, and a lot of room to grow and become deeply involved. Management also seemed genuinely interesting and invested in development. Commute is harder though sometimes.

The bigger issue is the ethical side of defence work and how it’s affecting my relationship.
My partner is strongly against military involvement and previously left a consulting role because of work connected to defence. Since I interviewed with Company 1, they’ve been extremely emotional and concerned that I don’t feel the same level of moral conflict they do.
What makes this difficult is that I do understand the ethical concerns. At the same time, I come from a background where defence/government engineering work was viewed very differently. I’ve worked with government organisations before and always saw things like armoured vehicles, bridge systems, logistics etc as also having humanitarian/disaster-relief applications alongside military ones.

I’m trying to figure out:
how people here view working in defence companies

whether engineers/inspectors in these environments wrestle with this morally

I also feel conflicted because part of me thinks healthy relationships should allow room for different values and boundaries without emotional pressure becoming overwhelming.

Would appreciate honest perspectives, especially from people who’ve worked in defence, medical, aerospace, manufacturing etc.

I’m still waiting for the outcome next week but I just feel so drained by my partner.


r/Metrology • • Mar 27 '25

Okay.. i need opinions on why datum bonus has not been abolished yet.

1 Upvotes

Years ago I measured a part and on paper, it was in spec with datum bonus.

During assembly, the part failed to assemble.

There was 6 bolt holes and B and C were just a post and a slot.

I remember they were trying to say I did not measure correctly and I showed them the TPs were clearly out of spec but the datum bonus made them "in". They said "well it should work then!"

So I went down a deeep rabbit hole of figuring this out and went as far as having a mating part machined out of my own pocket to PROVE you cannot apply datum bonus on more than a single feature at a time unless ALL GD&T have the same FCF and same bonus condition. And even then, you basically have to create a new bestfit alignment and keep re-reporting the datums to make sure they do not go outside the tolerance zone.

I designed a mating part with just the correct OOT conditions that made it in spec on paper but failed to assemble.

Once I showed the engineer, he blew it off but multiple engineers that was shown this, basically said I had proved the whole sytem is flawed.

The theory in a nutshell, is that unless the positions are all shifted the same way to apply translattion and rotation, datum bonus will fail. And features that dont have bonus called out, have potential to show in spec but fail real world. And profiles would ALL have to basically have the same vectors to apply datum bonus or they have potential to shift in two opposite directions (and profiles RARELY are a straight edge). And that is if you dont report individual points.

So what has anyone else dealt with and WHY is this still a thing? Can someone explain to me why I am wrong? I need to know if I am the only one that thinks the gdt handbook was written by just a bunch of engineers that dont know enough about measurement.

Has anyone gone this far just to prove an engineer wrong? 😆

Edit**

So after reading everything, I guess I should clarify a few things:

I used the term "Datum Bonus" and this seemed to really bother people. I am genuinely shocked this was not interpreted that the "SHIFT" is by the amount of bonus allowed per each datum.

For example, datum post is undersized by .05mm and the tolerance is +- .1mm.. the max shift zone is .15.. which is the feature bonus of that datum.

Almost every Metrology guy and engineer I have encountered in the last 17 years has used this term but very well aware the science behind it and how it is computed.

Second, the question should have been more directed to the fact that I have never once seen it used correctly on a drawing. Meaning, multiple features called out to, lets say ABC, some have modifiers and some do not. Then sub datum systems that have the origin feature of that system are called back to ABC, are NEVER labeled with modifiers. So this creates a "SHIFT" that will move the datums around inside dmis and report but does NOT report all the other features called out to ABC AFTER the shift. Non legacy dimensions are not linear. So you would basically have to manually shift the alignment and keep re-reporting each feature to make sure nothing goes out of spec in the SHIFT.. including the datum features.

I have proved this out that parts that pass on paper, fail real world assembly.

Getting rid of this all together seems like a much better and consistent way to make functional parts.

But thats just my opinion.


r/Metrology • • Feb 07 '26

Is it possible for two physical object to have the exact same length at any moment in time?

0 Upvotes

r/Metrology • • Apr 15 '25

Is there a reliable alternative to ZEISS CMM?

0 Upvotes

ZEISS is known for precision and quality, no doubt. But the cost can be a major barrier, especially for smaller teams or those just starting out. It makes you wonder: are there more affordable options that still get the job done?

We’ve already seen high-quality alternatives come out of China in other industries. Chinese cars, for example, have improved drastically—some now rivaling premium brands. And look at Bambu Lab: a Chinese company that quickly rose to the top of the FDM 3D printing game. Their printers not only offer speed and reliability, but in many cases, they even outperform machines that cost 3–5x more.

So why not CMMs? Is there a Chinese brand stepping up in this field too? Something with good accuracy, software support, and build quality—without the premium price tag?

If you’ve tried one or know a good alternative, I’d love to hear about it. Maybe it’s time we looked beyond the usual names.


r/Metrology • • Jan 14 '26

General AI tools that actually balloon engineering drawings? Need recommendations

1 Upvotes

Hey folks! I’m looking for AI tools that actually balloon engineering drawings (i.e., automatically generate balloon callouts for parts, dimensions, notes, etc., in CAD/PDF drawings). I know there’s a lot of AI hype out there, but most tools either miss elements, require tons of manual cleanup, or produce garbage output. Has anyone found AI that genuinely delivers useful balloons on engineering prints, not just slapped-on labels? Recommendations, personal experiences, workflows, plugins, services, all welcome!


r/Metrology • • Sep 20 '23

PC-DMIS

0 Upvotes

Hi guys. I'm a student in a vocational education and training school. We have a "Measurement" lesson, but we don't have any programs to practice. So I'm searching for crack version of "PC-DMIS" program. Any chances that you can provide some reliable links?


r/Metrology • • Mar 05 '26

What's a henweigh?

0 Upvotes

r/Metrology • • May 26 '26

Calypso Pi Web frustrations

0 Upvotes

I really, REALLY hate Pi-Web. First of all, just setting up an output page is an adventure, since Zeiss seems to think all metrologists are also HTML experts. But, I've eventually created a template that works for me.

BUT.....I set it to show on screen, and it pops up for maybe a second then disappears! Every_friggin_time I have to press the Pi-Web icon and wait another 10 seconds for it to appear again, so that I can save/print it.

PC-DMIS was so much simpler...


r/Metrology • • Aug 19 '26

GD&T | Blueprint Interpretation Is total runout really impractical to measure on a CMM?

3 Upvotes

Hi everyone,

Edit: I’ve used an LLM to create this text. I’ve checked it and, if needed, made corrections. Hopefully you don’t mind.

I’m a engineer working at a machine-building company. We regularly use total runout on our drawings, depending on the functional requirement of the part.

Our metrology department is asking us to stop using total runout and instead split the requirement into separate form/orientation tolerances.

The main feedback we’re getting is that:

Total runout cannot be measured properly on a Mitutoyo CMM, and

It is even more difficult/impractical to measure manually.

I’m not completely convinced by this, so I’d like to hear some opinions from people who work with CMMs and GD&T every day.

My understanding is that total runout is specifically intended to control the entire surface relative to a datum axis, and that it can be evaluated on a CMM if the datum reference, sampling strategy and evaluation method are set up correctly.

I’m also aware that manual inspection with an indicator and a rotating spindle/fixture can be a very appropriate way of checking runout on rotational parts.

What I’m particularly interested in is:

Can modern Mitutoyo CMM software properly evaluate total radial/axial runout according to ISO 1101 / ASME Y14.5?

Are there situations where a CMM is genuinely a poor choice for measuring total runout?

How do you normally inspect total runout in your shop?
Would you replace total runout with separate cylindricity, roundness, perpendicularity, position, etc. requirements purely because of inspection difficulties?

If you do replace it, how do you make sure the resulting tolerances are functionally equivalent to the original total-runout requirement?

Are there particular measurement strategies or CMM evaluation methods that make total runout more reliable?
For context, we’re talking about conventional machined rotational parts, not extremely exotic geometries.

I’d especially appreciate input from people who actually program/run Mitutoyo CMMs and from engineers who have to decide what goes on the drawing.

I’m trying to understand whether this is primarily a measurement capability problem, a CMM software/evaluation problem, or whether we’re actually using total runout in situations where another tolerance would be more appropriate.

Thanks!


r/Metrology • • Jan 17 '26

Polyworks Premium

0 Upvotes

Well, i have to say that Polyworks is the worst software i worked with, so far... For both CMM and CT. This software is a total crap!


r/Metrology • • Nov 23 '25

Advice Is the problem the scale or what I used to calibrate?

Post image
5 Upvotes

I got this jewelers scale from Amazon and decided to calibrate it for peace of mind.

The scale calls for 100g to calibrate, so I bought a 100g candy bar. I tested the scale afterwards by using two nickels, which should read as 10 grams but it's slightly under.


r/Metrology • • Dec 04 '25

GD&T | Blueprint Interpretation People are retarded

0 Upvotes

So I’m onboarding a Keyence LM-X100L for a company that bought the machine two years ago and then heroically committed to never using it. A true masterclass in ROI optimization buy the tool, admire the tool, avoid the tool.

This week they tell me the LM-X is “broken” because it can’t measure all three datums from their drawing. Then I open the print… and instantly understand why the machine tapped out.

Datums A, B, and C are defined on surfaces that are not even remotely stable, measurable, or unambiguous. You’ve got blends pretending to be flats, broken edges posing as datums, and geometry that looks clean only if you never try to measure it in the real world. Yet everything true position, hole location, profile gets stacked off that house-of-cards datum scheme.

Any metrology platform would revolt: LM-X, CMM, Faro arm, laser tracker, alien artifact doesn’t matter. The drawing is unmeasurable by design.

So no, the LM-X wasn’t “broken.”
The LM-X was politely refusing to participate in the fantasy.

Once I rewrote the datum structure and built a measurement sequence that reflects actual manufacturable geometry not theoretical artwork the system stabilized and started producing perfect data. Instantly.

This is the root problem in a lot of shops: they modernize the hardware but keep 1990s engineering practices. Automated inspection isn’t magic. If the datum features aren’t inherently stable, no machine on Earth or outside of it is going to give you reliable numbers.

The machine wasn’t the bottleneck.
The drawing was


r/Metrology • • Oct 07 '24

Hardware Support Q-Mark Stylus Quality

0 Upvotes

I'm in need of a certain size/length stylus with Silicon nitride tip and could only find it should by Q-Mark. Anyone have an opinion on their quality?


r/Metrology • • May 26 '22

how often do you break scanning probes on a contura or how many a year.

0 Upvotes

how often do you break scanning probes on a contura or how many a year.


r/Metrology • • Mar 10 '26

Position tolerance on a color plot

0 Upvotes

This is a question for those of you with CT scanning capabilities. I have a part im analyzing with a true position callout of .004" and the data im getting is showing the position to be out of tolerance. Im looking at a color plot of the part and according the color plot, the position should be in tolerance.

The color plot has a +/- .002" would this be the correct tolerance to use for the color plot?


r/Metrology • • Nov 29 '25

Is Mitutoyo on Amazon legit?

0 Upvotes

Hey there folks, I’m looking into purchasing a mechanical micrometer (103-137 from Mitutoyo) to accurately measure valve shims on DOHC engines for personal use. I’m located in Canada and all the local distributors I can find have this micrometer listed at over 200CAD, but there is an Amazon listing for about 70CAD. McMaster has them listed for ~100USD, but I’m used to McMaster pricing far higher on account of convenience offered.

All of this is to say, the Amazon listing seems like a good deal and the page looks official, but my spidey senses are tingling. I don’t trust Amazon on a good day, but the $130 savings would be nice. Does anybody have experience purchasing personal Mitutoyo tools from Amazon? I’d be curious to know how risky it is. Thanks!


r/Metrology • • Dec 02 '25

General Revolutionary UDATE System

0 Upvotes

r/Metrology • • May 01 '23

For my research paper hehe

0 Upvotes

Hi. The daily rainfall data I downloaded is in "inches". I want to convert it to mm. Is it applicable to basic conversion of measurements (1 in = 25.4 mm) or is there a proper way to convert rainfall data? Thanks in advance.


r/Metrology • • Aug 31 '25

Calibration Metrology Engineer

1 Upvotes

I have 15+ years experience in the calibration lab in India and Gulf (Saudi and Qatar) worked in different laboratories as calibration and lab supervisor, is my candidature suitable for Europe regions or Singapore?


r/Metrology • • Apr 04 '26

Hexagon PC DMIS CAD - Predetermined results

1 Upvotes

Just asking if I can set the software in a way where no matter what point I take , it will entry the dimensions I want which I have pre-determined. (cheat the system)? Is there a way?

As in just to show all dimensions in spec even though it's not during live presentation.


r/Metrology • • Jan 31 '26

New Metrology Instrument I am developing. Need help!!

3 Upvotes

Working on an instrument which is able to record the surface curvature of an object with high precision. With the curvature data, it will be able to determine geometry of the object like radius, ovality etc.

Patent has been applied for. Currently building the prototype. How can i commercialize it???

Update/Answers - :

Here are some more details-

  1. It is a hand held device. Can gather coordinate data of a patch of object surface in seconds.

  2. It makes physical contact with the surface, no lasers involved. 

  3. In contrast to vernier or screw gauge, it does not need access to entire geometry of the object.

  4. It differs from a CMM as we cannot define a datum with this, among other things.

  5. With the prototype i made, i am able to measure shaft radius in range of 70mm to 200mm with accuracy of .1 mm. But this can be improved to .o1mm with better electronics. 

It has its strength and i am not aware of any other device in market similar to this.

I want to know if there a genuine need for this in the industry?

Need help in its development.