r/Machinists • • 11d ago

QUESTION CMM programing

I’m trying to get a feeling for how long it should take to setup a cmm program. The guys doing it complain about the software being old and clunky, the guys above me say it should only take a day and is being used “around the world”. I’m new to CMMs so I’m not sure what to expect. A part of similar complexity to run would be an AR15 lower.

0 Upvotes

19 comments sorted by

10

u/ShadowCloud04 11d ago edited 10d ago

Depends on so much, part complexity is one, software for sure is 2.

We use calypso and a lot of turned parts. Grabbing some positions, runout etc from standard bores, and outside features, can be done in minutes to a half hour. If it’s more complex and fixturing comes to play it can take a considerable more amount of time.

And sorry I just saw your comment about an AR15 lower. Yeah that would take more than a day I imagine if its something that you are wanting to make repeatable. As theres a lot of fine tuning to make sure you are getting a robust inspection done.

5

u/Topher_Caouette 11d ago

I loved PC-DMIS, I found it fun. I’m also an insane person so I might be an outlier

7

u/ackerman1211 10d ago

PC-DMIS is such a doubled edged sword. So incredibly powerful, so easy to make it wrong.

Plus it software crashes.

I love it.

-3

u/Naive_Syrup_9997 10d ago

PC-DMIS is such an unstable trashy software.

4

u/CNC_Optics 10d ago

The way I see it is similar to programming cutter paths. Every feature requires a new path. Sometimes you can use one probe for the entire part and sometimes you need many (tool changes). If you programmed the part you can get a fair idea of how complex it will be to inspect.

1

u/DarkAeonX7 4d ago

Are the guys above you CMM programmers? If they aren't then I wouldn't value their opinion. A lot of rush and frustration are brought on by managers without any understanding of what goes into a person's job

1

u/Moostery42 3d ago

Nope, I need to build the argument to upgrade the software from the Stone Age, which will also require a computer upgrade.

I’m thinking of having the programmer track the time he spends in each stage of the process and try to find out if/how the software update could help. Also set the right expectations for those above me.

1

u/DarkAeonX7 3d ago

Not sure which software you're using but if it's PCDMIS, there's a hexagon posted page where they explain the importance of updating anything pre-2020 R2 to a later version. Pre-2020 R2 used a different math system called Xact and the new one is Geo Tolerancing. Xact would let you get away with doing things you shouldn't have been able to. GeoTol is a lot better at keeping you from doing "illegal" things

2

u/jkerman 10d ago

It depends on what you are using the CMM to validate!

in .001 tolerance land, if you can do "two point" distance checks for everything. I could whip you up a fixture and a program in a couple hours. all the travel is easy since you only need to hit each surface in one place.

If you want highly repeatable 0.0001" across multiple operators? Full surface scans of everything to simulate hard gauges? Great reporting with all your composite profiles? It just takes /so long/ to program and also validate and also document everything. I would want a couple of days to do something like a lower.

1

u/f119guy 10d ago

Highly depends on strategies. I can build a PCDMIS program for a complex 5-axis rocket engine part in a day and prove it out the next day. My coworker takes days, if not weeks. I use a lot of “paste with patterns” “loops” etc to be efficient.

2

u/CthulhuLies 10d ago

Any neat tricks to pattern around an axis that isn't in your current alignment? Or do you just do what I do and make a separate cad offset alignment to get those patterns in a rotatable pattern then report in the original alignment?

1

u/f119guy 10d ago

That’s what I do. Build an alignment with the axis where I want to rotate my pattern and go to town. I’m a bigger fan of that than loops but our principal programmer does some insane things with looping. We have lots of turbine blades and splines shafts that he’s always knee deep in

2

u/CthulhuLies 10d ago

Yeah I just don't always trust what PC-DMIS does when it updates the whole program after touching an alignment so I don't want to do that a whole bunch if I can avoid it.

1

u/f119guy 10d ago

Rightfully so. If I have the time I will verify the features still match CAD which still saves me time. I have quick measure setup for my general preferences but I have a high mix of work. Custom screws and such from the Swiss guys. 3D printed structures that are a couple feet long from the combustion chamber guys. Gnarly undercut geometry from our valve guys. And 4 axis rotary cmm work from turbo machinery.

2

u/chronic1977 9d ago

You can also left click to highlight a surface and the shift-click the feature. It will automatically grab all of the similar features contained in that surface.

1

u/f119guy 9d ago

I forgot all about that and I’m pretty sure they teach that in 101. I need to try that out for sure

0

u/TriXandApple 10d ago

Why would anyone be able to tell you this if you dont say what software you use?

Generally, I would say 1-2mins per feature, with a flat 15mins alignment time, plus some fixturing if required.

1

u/Moostery42 10d ago

PAS-CMM and then the move it to M-COSMOS to add the tool heads and a few other things. The versions they are running are old enough we are preventing any further win11 updates.

1

u/stumpycrawdad 10d ago

As a CMM nerd I just threw up in my mouth. Side note I'm pretty damn quick, an AR15 lower would take me like an 8hr shift to program and proof