r/Futurology • u/Sgt_Gram • 2h ago
Computing U.S. Army opening land on 8 bases, including one that houses our bio labs, to data centers, while veterans push to stop them
r/Futurology • u/Sgt_Gram • 2h ago
r/Futurology • u/mvea • 18h ago
r/Futurology • u/Gari_305 • 1h ago
r/Futurology • u/Chobeat • 22h ago
r/Futurology • u/bloomberg • 21h ago
r/Futurology • u/Gari_305 • 20h ago
r/Futurology • u/Gari_305 • 20h ago
German defense giant Rheinmetall is moving into one of the most futuristic areas of military technology: humanoid combat robots. According to recent reports, the company plans to present its first prototypes within roughly 15 to 18 months, placing a likely unveiling around 2028. The idea is bold, but the bigger question is whether humanoid robots can realistically become useful military assets anytime soon.
r/Futurology • u/mvea • 1d ago
r/Futurology • u/Polite_Sloth_67 • 1h ago
A lot of public discussion around future energy grids treats total generation capacity as the finish line, assuming that once solar, wind, or next-generation nuclear scale up cleanly, the transition is mostly solved. Looking ahead toward 2035, however, the tougher puzzle seems to be matching fast-growing industrial electrification and compute loads against multi-day weather lulls and aging transmission infrastructure.
Emerging long-duration chemistries like iron-air and sodium-ion, alongside thermal storage and automated industrial demand shifting, look promising on paper for bridging four-to-eight-hour gaps and even multi-day regional dips. Yet permitting multi-state high-voltage corridors and procuring large power transformers still move on five-to-ten-year timelines that software and battery factories cannot simply out-iterate.
Looking a decade out, which constraint do you think will actually dictate the pace of grid decarbonization: storage economics over multi-day winter lulls, transformer and grid-hardware manufacturing capacity, or local permitting bottlenecks?
r/Futurology • u/Gari_305 • 20h ago
r/Futurology • u/Gari_305 • 1d ago
"Dr. Doom" is back with a dire prediction for the US economy
r/Futurology • u/Gari_305 • 1d ago
Platform companies are luring doctors, lawyers, and Ph.D.s with top rates, but then use the same tactics of pay cuts and sudden ghosting that have plagued global data workers.
r/Futurology • u/Gari_305 • 1d ago
r/Futurology • u/hoangson0403 • 2d ago
r/Futurology • u/Gari_305 • 1d ago
r/Futurology • u/npr • 1d ago
r/Futurology • u/Gari_305 • 1d ago
Cybersecurity has been an afterthought since the early days of the internet. Now A.I. is uncovering dormant problems, making the bill come due for decades of vulnerable code.
r/Futurology • u/thebafflermag • 1d ago
r/Futurology • u/Gari_305 • 1d ago
r/Futurology • u/Gari_305 • 1d ago
Kristalina Georgieva says countries needed to be ready for tech rollout, adding: ‘You snooze, you lose’
r/Futurology • u/Gari_305 • 1d ago
Americans now fear AI more than they fear watching a family member receive a terminal cancer diagnosis.
r/Futurology • u/All4Fee • 1d ago
r/Futurology • u/lughnasadh • 2d ago
Insufficient transmission capacity. The cost of connecting projects. And a slow and complicated approval process. These are just some of the reasons behind the backlog.
Data centers have become hugely unpopular, but people will still need them. The businesses who want them won't pay the taxes to upgrade the grid, so why don't they build their own micro-grids? Then they can build the data centers in remote locations, where they won't burden everyone else. China does it.
r/Futurology • u/Gari_305 • 1d ago
Anthropic’s Levent Alpöge says it took six weeks for him using the AI tool to solve 19th-century Riemann hypothesis