r/DynamicsGP • u/StFein • 8d ago
Dynamics GP 2018 R2 Windows server and SQL server
We are in the process of selecting a replacement for GP since it is at end of life. In the meantime, we have an issue where our application server is outdated and we are unable to upgrade it from Windows server 2016 to 2019, due to incompatibility issues with our current version of GP - 2018R2. Moving to GP 18.2.1013 would allow us to bring the app server to Windows 2019, but doing an upgrade to GP when we are in the middle of replacing it would be nearly impossible. We need to do something before mid January for security purposes. The server team has been looking at moving everything behind a jumpbox but because checks are printed from a local printer (non-networked), this has issues as well.
Does anyone have any insight to running GP 2018R2 on win server 2019 even though it is not supported by Microsoft?
Does anyone have any insight on upgrading from 2018R2 to 18.2.1013? Wondering if the time it would take is similar to the time it took to get from GP2016 to GP2018, or if it is more of a patch install.
Does anyone have any insight into just putting it behind a jumpbox, but still allowing a user to print checks to a local printer?
Any thoughts or advice would be welcome, I am not at all thrilled to be having this conversation at work right now while also finalizing the decision to move to Netsuite or Workday. 😰
3
u/PinkertonFld 8d ago
You should have no issues running on SQL2019 with 18.2. It's usually is issue if you are running a newer version of GP than the supported SQL. (IE: Sql 2012 on GP 2018).
FYI: If you have support, "upgrading" from 18.2 to the latest (18.8) isn't a huge ordeal (and recommended, as you'll probably want to have your GP server available as an archive for some time/years, even if you switch.) All of the 18.x releases after 18 itself are nothing more than a patch file, not a reinstall like going from say Version 2015 to 2018.
FYI: While Microsoft Support is ending, there are 3rd party alternatives that will support GP (on-site or cloud based) even when Microsoft leaves in 2031. Check here: https://knightsofgp.com/
3
u/heelstoo 8d ago
I’m dreading our GP migration to a new ERP next year. I still need to evaluate what would be best for our business.
Sorry I can’t weigh in, OP, other than wishing you luck.
2
u/Squishasaurus_Rex 7d ago
Same. We just selected BC as our new ERP yesterday with the goal of spending all 2027 working on implementation and a go live in Jan 2028. I have a feeling it’s gonna be a long year.
1
u/heelstoo 7d ago
Yea, it’s likely we will pick BC, too, but this is a rare opportunity for us to ask, “just because it’s the best for our MSP, and maybe easier to migrate to, is it the best for us over the next 5-10 years?”
Maybe I’m trying too hard.
3
u/JosephMarkovich2 7d ago
There's still plenty of runway left for GP. A lot of the partners are choosing to ignore that.
Joe
1
u/Squishasaurus_Rex 7d ago
Our team was unanimous (thank god) after spending nearly all of this year in a slog of different demos. Sage was our runner up but our group is really attached to the Microsoft environment. Many of our users have 20+ years of GP experience, and you can still find bits of its skeleton inside BC. I’m actually our contracts and purchasing director, so I was gunning for BC the whole time. Contracts365 was my top choice in CLM after demos, too.
1
u/thisying 7d ago
I'm in a similar situation, my job is switching to business central in a year or two
2
u/u100009 6d ago
Customers using GP are scared by the marketing system from Microsoft about their GP.. Every situation has its challenges, but rushing into a new ERP just because your partner or Microsoft tells you to, is a big mistake. Your business process is what's going to drive whether you have outgrown GP or not, not the marketing hype.
4
u/Background_Lemon_981 8d ago
If your GP is on a virtualized server, this is easy. Just clone the VM and upgrade it to Server 2019. If everything works, great. But if it doesn't, then you still have your original VM to fall back on to come up with a plan. You can do the entire Server 2019 upgrade in less than an hour. Just schedule some time after hours to get that done. And you'll need some time for testing too. Test, test, test.
We did a GP upgrade and server migration combined a few years ago. Having our GP partner do all that cost about $9k. But if all you are doing is upgrading the Server OS, I think you will likely be OK just doing that.