Basement Header
Looking to make basement opening wider. Plan to use (3) 2x8x6’ with (2) 1/2” osb for spacers, structural screws and construction adhesive. Load is supporting 1st floor joists spanning 14’
43
u/Homeskilletbiz 1d ago
Ok.
Long as we’re updating each other with our plans, I’m planning to get drunk tonight.
7
2
1
u/ImAPlebe Chainsaw Cowboy turned Wood Surgeon📐🛠️🪚 1d ago
I'm planning on getting cross faded and watching the habs game tonight. Have a good night boys!
6
4
3
u/SpecialistWorldly788 1d ago
Looks like it would be ok, though you might want to consider an LVL or something better, but when we framed openings years ago anything 6’ and wider required at LEAST double cripples on each end (jack studs is probably the more “proper” term I guess)
1
u/Maleficent_Nerve4607 1d ago
Looking to make basement opening wider. Plan to use (3) 2x8x6’ with (2) 1/2” osb for spacers, structural screws and construction adhesive. Load is supporting 1st floor joists spanning 14’
-6
u/CathartingFunk Red Seal Carpenter 1d ago
You should have an engineer look at it.
11
u/Proper-Bee-5249 1d ago
You’re joking - why not just use a span table?
1
u/CathartingFunk Red Seal Carpenter 1d ago
Doesn't seem to me like this guy knows how to use a span table.
-3
u/Bright_Crazy1015 1d ago
What's above it? 1 more story or three? Any load bearing path stacked on it or just the floor joists?
FWIW, technically structural changes typically require a permit, which then requires scale drawings and proposal anyway. If OP isn't drawing it up personally, may as well just get a stamped set.
3
u/KillerKian Red Seal Carpenter 1d ago
What's above it? 1 more story or three?
In either case, the span table would tell you what's required.
2
u/randomn49er 1d ago
That span will require 2 cripples on each side instead of the 1 that is there now. Your 3ply beam should be laminated and then the plywood if you wand it packed out. The plywood won't matter structurally.
You will also need to shore both sides of the bearing wall to hold up the floor joists above while working.
Structural work in my area requires a permit.
2
u/penispotato69 5h ago
I frame houses for living, your good homie honestly if it was my house I wouldn't be doing plywood glue and screws lol, a triple 2x8 nailed up, I would definitely do double jacks tho. I also would not bother building shoring walls I rip stuff out and move doors all the time its not gonna instantly collapse lol, id only maybe be concerned if there was tile above potential the grout could crack but even than id still go for it. I could probably have that door ripped out and new opening installed in under 5 min.
3
u/Aggravating_Sun_1556 1d ago
Hey, I’m no genius, but if this was my call, and I didn’t have engineering, there would be as much LVL as I could fit in there.
It’s a might be a couple hundred dollars more, but how much does it cost when you’re the person being called when it’s not good enough?
Don’t cheep out and try to do the minimum you can do.
1
u/Advanced_Aerie5854 1d ago
Absolutely this. Really should have an engineer but if I did not, it would be a triple 2x8 lvl (assuming 2x6 framing).
2
u/Valuable-Leather-914 1d ago
Double top plates and a solid header like that means it’s structural
10
1
u/Krauser_Carpentry 1d ago
Honestly i would shore this on both sides of the door way to catch the joists on both sides. Thats 2 separate joists face nailed to each other and if you only support one of them its going to be a bad time. The span is less than that of the header so youll point load your top plates with zero support underneath.
Hard to tell from the picture but unless you have like 6 inches of baring on those other joists i wouldnt support them from that side.
1
u/acoffeetablebook 1d ago
Before you cut anything I'd put up a temporary wall on each side to carry those joists, since a 14 foot span puts real weight on that opening. Three 2x8s may be fine for a short opening, but I'd run the size by the lumber yard or a span table for your load. Also make sure each end sits on proper jack studs, not just screws into the kings.
0
u/Shorty-71 1d ago
What comprises the existing header?
I’d think about some parallam PSL type members ilo dimension lumber if you’re uncertain on the strength.
-4
u/silverado-z71 1d ago
It looks like you got two by tens up there now I don’t know why you wanna switch over to three 2 x 8. I would just take those two by tens out and just put two more two by tens in the full length of the span, there’s a reason we use two by tens for loadbearing walls
6
-1
u/armedandfriendly 1d ago
How many floors is it supporting? You might be entering consulting an engineer territory.
2
u/Maleficent_Nerve4607 1d ago
Going to send it with 3 -2x8 lvl’s