I’m looking at purchasing a property as a buy-and-hold rental. The plan would be to get the existing front house rented, but there’s also a value-add opportunity to build a detached ADU in the backyard, or potentially convert/rebuild an existing detached structure.
The ADU project could start fairly quickly , possibly within a few months of the tenants moving into the front house.
For anyone who has done something similar, I’d love to hear about your experience.
Did you tell prospective tenants about the future ADU construction before they signed the lease? If so, how did you explain it, and did you put anything specific in the lease regarding the future construction?
I’m also curious about the logistics of having tenants living in the front house while a detached ADU is being built in the back. Things like:
Contractor access to the property
Construction hours/noise
Parking and driveway access
Temporary utility shutoffs
Fencing/separating the construction area from the tenants
Loss of backyard access during construction
Tenant complaints or expectations
Whether you discounted the rent during construction
Any lease language you wish you had included beforehand
For investors/landlords who have actually done this, did you run into any unexpected problems with your tenants?
And for contractors who have built ADUs on occupied rental properties, are there things owners commonly overlook or should plan for before construction starts?
I’m mainly trying to think through the logistics ahead of time and figure out what I should disclose or structure differently when initially renting the front house.
Would love to hear what worked, what didn’t, and anything you would do differently next time. — in Sacramento.