TLDR: I think a few planks in my floor need redoing and itās causing a fight. Am I right though that the variation is beyond reasonable (pictures arenāt the best and everyone who has seen them says what the fuck)? If you have time on your hands and want to read an insane story, fill your boots below.
This will possibly be long, but thereās some back story and I guess I just need to vent after 11 months of acknowledging this has not been a straight forward, easy, successful or completed full Reno. Also, swearing, because despite education, life experience etc, Iām a bogan and arsehole at heart.
Over the last several months, Iāve had the 1980s orange cork flooring replaced with bamboo flooring, in 2 stages. Upstairs went quite well, and I was happy enough with the results (despite not appreciating the transitions strips, but whatever; I was, and still am mentally exhausted). Downstairs began once the areas had been built and walls were in to define each room. 50% deposit was asked for and paid prior to commencement (FWIW this is either a state based or national chain, donāt really care at this point in time, not some fly by nighter found on Facebook who could do it ācheapā).
I suppose I should have realised they were going to be hard to deal with when they had a bitch fit about my (new) oven. It hasnāt been installed and was in there way. No problem I told them, Iāll move it to an already done area so it was out of their way. They argued it was too heavy to move and outside of their job scope (not once did I ever ask, tell or expect they would move it). So I told them I would have it moved and installed. Then they complained it would in the way for laying the flooring there and that I really shouldnāt have had the kitchen installed first, it should have been walls then flooring so the flooring could be laid properly. I guess existing houses never get new floors because it seems thatās an impossibility, but I digress.
They also showed me how the pad was not levelled and what my options were. I appreciated that, gave them to go ahead to level it and paid for that component in full.
It took months to get downstairs done, and hereās where the back story kicks in.
My husband and I bought this house in April last year, settled in May and commenced gutting it on day one. We had just brought it back to the studs and demolished what was the laundry, the kitchen and knocked out a few walls. We had engaged some contractors to do some shit we couldnāt do, like the driveway and pad for the garage, adding some concrete downstairs for the new rooms etc. Then, some fucker in a truck decided he had better things to do than pay attention to his driving and killed my husband.
So here I am, walking this path I never imagined. Organising a funeral on the other side of the country, trying to console 5 kids,3 of which still live at home and are special needs, finish my qualification (I didnāt had to withdraw with only several hours of paperwork to do), navigate the legal system for the case against the driver (still ongoing), insurance, rehab, mental health unit stays for myself and 20 yo son, DVA, CSC, and on and on and on. Hence my exhaustion.
Now my husband and I worked well with renos. I saw and he did. He knew how to do so many things and even things he didnāt know, or couldnāt do himself (like electrical etc), he still very much knew the lingo and could talk the talk. And hereās me, not knowing jack shit about diddley squat beyond āthis is how I want it to lookā. The person I spent over half my life with was gone, I couldnāt tell what was right and what was wrong.
And when some of these tradies offered to step up and help, in the midst of my grief I agreed. They say you shouldnāt make major decisions in the first year, and I 100% agree. I also acknowledge that sometimes, like this situation, you donāt get a choice. We were in a rental that was for sale, we had a mortgage, and my income had just dropped by about 65% on an ongoing basis so I had to get the house liveable as soon as possible.
Well didnāt I get fucked right over. One tradie charged me $17k to plaster 90% of upstairs (and ok, itās a big house, 4 bedrooms upstairs, kitchen, dining, living room and butlers pantry) and replace some of the ceiling (some of it just collapsed as they were working, which was unsurprising, whether all they replaced needed replacing is debatable). Then never showed up to complete the job.
My plumber got half way through organising the DA for the downstairs laundry and bathroom then broke his back.
And the landscaping was paid in full and never completed. Actually at the end of the day the company had to reimburse me just over $83k. The brickwork they did had to be pulled down and redone because they didnāt tie it in, and Iām pretty sure should wobble when you put your hand on it. This is about to go through NCAT or whatever for the $17k+ of work not done/had to be redone because of their incompetence that he refused to acknowledge now the bill is in.
I tried to paint the house, that was one thing I could do. I think I got like 2 rolls in of undercoat and decided my head wasnāt doing that, so called in some painters to get quotes. Only one showed up. He was busy. His quote was high, but he could get it done in about 4 weeks. Without asking he pulls out his trade licence to show me. It hit a sweet spot. The entire team is cross qualified and by this point the only trade I had any joy with was my sparkies. Expensive, yes, but they show up and do amazing and honest work (and itās a small town where reputation matters too I guess for some businesses). And electrical work was one thing this crew wasnāt qualified to do. Everything else I needed was there in this 65yo man who has an awesome, awesome crew.
But Christmas was just around the corner so downstairs was really only completed about 2 months ago (although still not complete complete, thereās still some little things to do which donāt impact livability). When I told the owner of the business what I needed and spoke about what has happened, he told me he had me and would have the house liveable by Christmas and he did. Look, Iām just going to sing their praises. When he invoices me, it comes with receipts for everything heās purchased and heās not whacking a surcharge on me for those items. The carpenter drove to a town 45 minutes away to have a look at some framing in a shop because I wanted to replicate it. I sent them up to my daughters to do the kitchen and replace windows when she was overseas, the finished the day before she returned. He called and asked if would like him to run up the shops and grab a loaf of bread and milk for her so she had it when she came home. They helped me move out of my rental. Theyāve organised other trades for me when I havenāt been able to find them myself (a new bricklayer, a plumber, aircon, shower screens). I send him photos of what I see and he nails it every time. He has also spent considerable time going through my contracts with other dodgey tradies and pointing out what is wrong with it, how to approach tackling it and even offered to pay for a solicitor up front if I needed it, and he would smooth it out over the invoices for me. So, despite the fact theyāre a ridiculously expensive crew, those little things are the big things, as well as they know their shit and do an amazing job.
So, back to my floors.
The flooring guy came in, did half the job and left because there were bits that needed to be done before he could complete it and that was fine. It was arranged for him to come back in a fortnight. And Amazing Crew made plans to do work based around the flooring guys timing.
Floor guy shows up 2 days late. Turns out, he had been pulled over by the cops and doesnāt have a licence. I think he was also drunk or high but whatever, he lays floors really well.
Except he canāt finish the job in that time frame, because heās lost 2 full days and needs to disappear early on the Friday to go on a weeklong bucks night overseas.
And my carpenter finished laying the floors in one room because to not do so would throw their schedule off.
Floor guy comes back a couple of weeks later. No communication, he just shows up. Thatās fine. I have tradies everywhere, my pool company is there (haha, that started mid March and to date is still not complete, I still have tiles needing to be laid and temporary fencing for fucks sake). The renderers have travelled to do this job so there is scaffolding about, plumber and sparkies trying to do their jobs too. Sorry not sorry for the inconvenience.
The floor gets done, except there is still a transition strip or 2 to be laid, so itās not completed. There is no āare you happy?ā. So imagine my surprise when 2 weeks prior I get billed for it being completed and 2 days prior to those last bits being installed get an overdue notice.
So the day after the strips are laid, I email back with being displeased about being āoverdueā when it wasnāt even finished, and in my opinion still remains unfinished. Amazing crew are laughing saying itās about time I got my cunt on and stuck up for myself, because enough is enough.
If I had been asked if was happy with the floors downstairs I would have said no. There are 3 planks that to me look yellow, when the rest of the flooring is reddish. I understand that variances happen, but there should be a tolerance before logic kicks in and goes nope, this is wrong.
So when I pointed it out to the floor guy, he tells me it came from the same packs as the others. Yeah? And? Then he tells me how hard it will be to replace those boards and it might be very slightly uneven. Yet my head says well do whatever you need to do to make it even you dickhead. Iām not paying $55k to have mismatched and uneven floor, simple. Then he tells me he isnāt able to do anything without talking to the boss so he lets the boss know whatās going on.
The boss is a first class wanker. Heās the one who bitched about the oven. He also rang me after upstairs was completed first thing on a Tuesday morning to tell me I needed to pay the bill. Which had been sent on the Thursday evening just prior (it was paid basically whilst he was on the phone to me).
The boss comes out to look at my concerns. It all came out of the same packaging he tells me. No shit Sherlock, I want to say. Instead itās more along the lines of āI appreciate that, but Iām not happy with the variance, itās too muchā. I even pointed to other flooring that varied and said it still blends in and I was ok with that. He then starts on how hard it would be to rectify and I tell him thatās not my problem. He tells me it will be slightly uneven, and I tell him the floor layer and I have had that discussion. He tells me it stinks because they paid for all the flooring up front a year ago and Iām withholding payment (the remaining amount due is $6600, out of what is now just over $55k). I said it hasnāt been that long and that I donāt accept the job as being finished and Iām already taking contractors to court over their bullshit so no, it needs to be fixed. So he says fine he will organise for the layer to get out here ASAP as I still have a carton of planks that is half full and a carton that hasnāt been opened. I also told him I didnāt appreciate the bill and overdue notice when the job hadnāt even been finished. He said it was just a couple of transition strips that had to be laid so it didnāt matter but obviously the accounts team were unaware, but I should still pay the bill. I told him the job wasnāt finished to their satisfaction prior to the two payment notices, and itās not finished to mine.
Itās been about a week and all Iāve heard is an email from the accounts team. They understand my frustration but as the boss said to me, itās a manufacturing floor and I need to take it up with the manufacture, not them. Boss never said that to me. He just spoke down to me like the miserable sack of shit he is and had a toddler tanty. Ultimately the way I see it, I should have been asked I was ok with that variance at the time of laying it so this whole fuck fight could have been avoided. Accounts want their money. Accounts can go fuck themselves sideways with a pineapple up the eye of their dick as far as Iām concerned right now, and I told her, until both them and I agree the job has been satisfactorily completed I am withholding that last bit of payment.
I kind of want to reply to the email and say there was never any discussion about manufacturers and if Boss wants to lie thatās a him problem not mine but until itās completed, as I said, Iām not paying. But, the only new information is that the boss is a liar and I have better things to fill my days with (like long stupid Reddit posts, but hey, I was just made redundant as of yesterday so killing time here).
So anyway, renovators of Reddit, am I right or am I right or am I right (clearly, I feel Iām in the right)? The disputed planks need to be changed cause the variance in colour sucks and until thatās done, I should withhold that final payment?
Oh oh oh. I lie: I did get another bit of correspondence from them! Another bill for $2700 for prep work. This was never discussed with me and I have no fucking idea what additional prep work was undertaken. To my knowledge, none, so they can stick that $2700 in their pipe and smoke it alongside the floor laying guy too for all I care (I will inevitably pay it if itās reasonable, however would merrily argue it with them all the same) but I would like an explanation of what it was for, why it was never communicated to me and a fucking apology for not doing so first because maybe I could have done it cheaper myself).