r/ActualFurnaces • u/CreativeWorkout • Nov 20 '24
Short basement, so 1/2" clearance to fire-rated drywall above gas furnace. Okay?
I read 24" clearance is required to combustible materials, and elsewhere I read I need 24" clearance to drywall (regular drywall), but nowhere can I find how much clearance is required (if any) to fire-rated drywall (type x, 5/8" thick).
The ceiling is ~6'3". The furnace is ~6'2". Goodman model # GMV950905DXBB. Upward-flow installation (the flame is in the bottom half).
It was professionally installed, and several companies have come for maintenance, including the company that has its maintenance plan as part of the natural gas supplier's bill. They never commented about it.
There is 1/2" presumably-non-fire-rated drywall over part of the furnace, but most of that appears to have been torn down for some reason - I think before my family bought the house 30 years ago. Between joists is insulation installed 30 years ago. The furnace is 14 years old. So far so good means ... it's not a problem?
The installation manual does not mention fire-rated drywall: questargas.com/ForEmployees/qgcOperationsTraining/Furnaces/Goodman_%20GMV9_GCV9.pdf
(I also googled.)
If the rule was 6" clearance but there's only 1/2" or 1/4" clearance, is that a problem?
