r/Python • • Mar 24 '21

Discussion Python made me look like a WIZARD

Today in work a request comes in for 745 headshots that need to be processed to fit 150x150px for an external platform. One team says it'll take them at least a week to do, the other team says they don't want it as it'll take even longer.

"They need them all black and white! It'll take some time to convert them! They're not even all the same size! UGH this just can't be done in the 2 days they've requested this!!!"

12 lines of code, the Pillow library and exactly 8.856 seconds of running said code... It was done. Panic over. Client happy.

I work in a design team but I'm a job coordinator (so I sort the jobs and make sure the right designers get them). They were amazed it was done so quickly without using Photoshop.

They asked how. I gave them the answer.

Python baby 😎

EDIT

For those wanting to know the code, here it is:

from PIL import Image
import os

for f in os.listdir('Input'):
    if f.endswith('.jpg'):
        im = Image.new('RGB', (150, 150), (255,255,255))
        im2 = Image.open('Input/{}'.format(f))
        im2 = im2.convert("L")
        width, height = im2.size
        im.paste(im2, (int((150 - width) / 2), 0))
        fn, fext = os.path.splitext(f)
        im.save('Output/{}.jpg'.format(fn))

The images given were either 150x150 already (but in colour) or 120x150. So had to cover all bases with this. If it could be made more efficient, let me know!

2.2k Upvotes

278 comments sorted by

View all comments

Show parent comments

42

u/d64 Mar 24 '21

You know how consulting companies that have done some kind of a job many times before will bill a customer say 40 hours for doing it, even though it might take them only 6 hours to do, because of their expertise?

Employees can and should do the same. Say this job was said to take days. Tell you will do it, then write the script or use Photoshop batches or whatever, be done in 45 minutes. Then spend the rest of the day on your own projects, then report triumphantly that you managed to pull it off in just one day. You are seen as efficient, but you are not shooting yourself in the foot by revealing the job can actually be done in no time at all.

22

u/[deleted] Mar 24 '21

It's not my main job - I'm a job coordinator so I handle the requests for work. I just program on the side for fun and wanted to help out. I guess I need to be careful it doesn't open a door for them to request more of this and I land myself in a hole!

7

u/sodjanathan Mar 24 '21

The kind of hole that brought me so many sql reports requests at work with no extra pay

4

u/LilQuasar Mar 24 '21

these tasks compensation should be based on the result and not the time it took. thats what the employer cares about after all

10

u/d64 Mar 24 '21

Well yeah, but think about the flipside: then even if it took someone a day to do it, the company would surely only pay them for 45 minutes.

2

u/LilQuasar Mar 24 '21

there would be no such thing as paying for 45 minutes

2

u/[deleted] Mar 24 '21

Richard Feynman talks about a situation at Los Alamos where he could break into locked cabinets rather quickly. He wouldn't let anyone watch and would always wait extra time and drip water on himself to make it look like he was sweating. He didn't want the higher ups knowing how easy it was and changing the locks so he couldn't break in.