Barely related, but does all of Canada call the mains "hydro" or is it specific to areas where the power is generated primarily by hydro-electric, or is it generated by hydroelectric everywhere?
Quebec, Manitoba and BC are all almost 100% hydro electricity, also all the companies are "Manitoba Hydro" or "BC Hydro" etc. So we just add it to everything
"I totaled my car by hitting a hyrdo tower" (not transmission tower)
"Honey did you pay the Hydro bill?" (not electric / power bill)
No idea to be honest, it's not something I can really remember occurring (at least not unintentionally). We'd probably say its restricted, rationed or managed. The disclaimer being I have no idea what the grid engineers would call it.
A quick search on google for "National Grid brownout" does show some use of the term though - although typically with the caveat of a description next to it.
Magnam dolorem accusamus tenetur. Dolores sit ut quaerat at. Perspiciatis consequatur dolorem esse sunt voluptatem. Natus sapiente aut qui dolores facilis aliquam aut quia. Saepe aut asperiores sit natus fuga autem quo. Eum est veniam consequatur qui ea aut.
Blackout is good though in this context, just like lots of the others, because brownout is a lesser variant that someone can intuitively understand in context. I don't think the names of any of these things is a huge deal, but I guess I'm not as racially charged about everyday life terms as an American.
That’s how I have been explaining it to coworkers. Master/slave works but primary/replica for storage/databases, controller/worker (or captain/steward) for Kubernetes nodes, and allow/blocklist for firewalls work immensely better.
94
u/trannus_aran Jun 16 '20
Which from a UX standpoint also makes more sense. (Blackout’s fine, too, but this makes even more sense, w/o being verbose)